BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Jim Sly
|
|
|
tommy Phone #: ###-####
|
BLD-Wall Bracing | 10/24/2018 | 10/25/2018 | 10/25/2018 | A | PASS |
Jim Sly
|
|
|
shear // Tommy Phone #: ###-####
|
Routing Walk-In (BLD) | 10/18/2018 | 10/18/2018 | 10/18/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/18/2018 | | 10/18/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/18/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/18/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Nicolette Womack
|
|
|
No 220V or full bathroom allowed. If so, ADU Required.
|
Routing Walk-In (BLD) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 10/12/2018 | | FAIL |
Josh Bogle
|
|
|
lacking floor plans, site plan, & section view
|
1st review completed | | | 10/12/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 10/12/2018 | | | |
|
|
|
|