OVERRIDE | | | 2/8/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/6/2019 | 2/6/2019 | 2/8/2019 | | PASS |
Josh Bogle
|
|
|
plan mod - waiting on plans
|
Routing - PLAN CHECK | 2/6/2019 | | 2/8/2019 | | PASS |
Josh Bogle
|
|
|
1 hour plan mod review fee
|
CHANGE STATUS TO (ISS) | | | 2/8/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/8/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 2/8/2019 | | DONE |
|
|
|
|
BLD-Energy code compliance | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Mike Jordan
|
|
|
TJ Phone #: ###-####
|
Plan Modification Accepted | | | 2/6/2019 | | DONE |
|
|
|
second plan modification per Josh
|
CHANGE STATUS TO (ISS) | | | 2/6/2019 | | DONE |
|
|
|
per Josh - expecting plans for plan mod soon.
|
BLD-Framing/Rough-in | 2/1/2019 | 2/5/2019 | 2/5/2019 | P | PASS |
Mike Jordan
|
|
|
TJ Phone #: ###-####
|
Routing - MECHANICAL | 1/28/2019 | | 1/28/2019 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Footing | 1/3/2019 | 1/3/2019 | 1/3/2019 | P | PASS |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Thickend footing for new stairs.
|
OVERRIDE | | | 1/2/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/2/2019 | 1/2/2019 | 1/2/2019 | A | PASS |
Michael Hanson
|
|
|
***PLAN MODIFICATION WORK TO INCLUDE FOOTING UNDER STAIRWAY AND R-19 INSULATION NOTE*** MDH
|
Plan assigned to (JAB) Josh | 1/2/2019 | 1/2/2019 | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
***PLAN MODIFICATION WORK TO INCLUDE FOOTING UNDER STAIRWAY AND R-19 INSULATION NOTE*** MDH
|
Routing - PLAN CHECK | 1/2/2019 | | 1/2/2019 | | PASS |
Michael Hanson
|
|
|
***PLAN MODIFICATION WORK TO INCLUDE FOOTING UNDER STAIRWAY AND R-19 INSULATION NOTE*** MDH
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
***PLAN MODIFICATION WORK TO INCLUDE FOOTING UNDER STAIRWAY AND R-19 INSULATION NOTE*** MDH
|
Inspection Record Card- Bld | | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 1/2/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/2/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 1/2/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/2/2019 | | DONE |
|
|
|
Left voicemail for parcel owner to inform them since the GC is no longer going to do the work, we need the 302 filled out.
|
Routing Walk-In (BLD) | 12/11/2018 | 12/11/2018 | 12/11/2018 | A | PASS |
Josh Bogle
|
|
|
talked about possible plan modifications
|
BLD-Other | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Mike Jordan
|
|
|
basement walls //Tony Phone #: ###-####
|
BLD-Concrete | 11/6/2018 | 11/7/2018 | 11/7/2018 | P | PART |
Mike Jordan
|
|
|
basement wall- Tony Phone #: ###-####
|
BLD-Foundation | 11/1/2018 | 11/2/2018 | 11/2/2018 | P | PASS |
Mike Jordan
|
|
|
Tony-foundation wall in basement Phone #: ###-####
|
BLD-Footing | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | PART |
Mike Jordan
|
|
|
late afternoon // Tony Phone #: ###-####
|
OVERRIDE | | | 10/12/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/12/2018 | 10/12/2018 | 10/12/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/12/2018 | | 10/12/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2018 | | DONE |
|
|
|
|
Application received | | 10/12/2018 | | | |
|
|
|
|