BLD-Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 | | PASS |
Tell Riley
|
|
|
Expires: 11/26/19
|
BLD-Framing/Rough-in | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-#### Framing OK......but left note: do not insulate or cover W/O electrical Rough in inspection.....
|
BLD-Footing | 4/8/2019 | 4/8/2019 | 4/9/2019 | P | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-####
|
OVERRIDE | | | 10/15/2018 | | |
|
|
|
|
Routing Walk-In (Zoning) | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/15/2018 | | 10/15/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/15/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/15/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/15/2018 | | DONE |
|
|
|
|
Application received | | 10/15/2018 | | | |
|
|
|
|