BLD-Final | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tony Young
|
|
|
Bret Phone #: ###-####/// final ok
|
DOC - Permit Finaled | 9/13/2019 | 9/13/2019 | 9/13/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Brandon Shaw
|
|
|
Smoke/ Carbon detectors all need to be interconnected and working... Landing at Deck and Garage man door- floor not more than 7 3/4" below threshold...
|
BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | CANC |
Tony Young
|
|
|
per Cara cancel final will call later to reschedule
Please call Cara, 30 minutes prior to arrival. Thank you! Phone #: ###-#### >> Inspection requested via web by Bret
|
BLD-Final | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | NR |
Tony Young
|
|
|
Kara Phone #: ###-####,, needs elec final 1st
|
Routing Walk-In (BLD) | 5/16/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Josh Bogle
|
|
|
discussed WUI deck options
|
Routing Walk-In (BLD) | 5/15/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Rob Patrick
|
|
|
questions on plans approved (customer left blh)
|
BLD-Energy code compliance | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Tony Young
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PART |
Tony Young
|
|
|
Brett Phone #: ###-####,, see paint notes,, fire blocking, strap,, support,, seal,, etc,, ok to insulate,, deck portion not done yet
|
Inspection Record Card- Bld | | | 12/18/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2018 | | DONE |
|
|
|
Parcel owner wants the GC to be listed as the permit holder. Spoke with GC to inform them we need the GC Form filled out and to have a letter from the parcel owner saying they want the permit in the GC name. (per Tisha no fee for name change)
|
BLD-Footing | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, work in progress
|
BLD-Footing | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PART |
Tony Young
|
|
|
Colbi Phone #: ###-####,, ok after adding rebar per plan
|
PubWorks Subgrade Approval | 11/15/2018 | 11/15/2018 | 11/15/2018 | | DONE |
Melissa Jannusch
|
|
|
FOUNDATION A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Conference | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | NR |
Tony Young
|
|
|
Colbie ###-####
|
BLD-Footing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | NR |
Tony Young
|
|
|
Colby Phone #: ###-####,, needs soils approval 1st
|
Routing Walk-In (BLD) | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/16/2018 | 10/16/2018 | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
10/19 addition, paper - 1st done
|
Routing - PLAN CHECK | 10/24/2018 | | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/24/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/15/2018 | 10/15/2018 | 10/16/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level two, routed to ESC
|
Routing - Erosion and Sediment | 10/16/2018 | | 10/16/2018 | | PASS |
Andy J. Long
|
|
|
Minimal earth disturbance for footings to support small second story addition, dirt to remain onsite for use. Work in vegetated backyard. No ESC permit required per described scope of work. If any violations or complaints are received, an ESC permt shall be required.
|
Routing - PLAN CHECK | 10/16/2018 | | 10/16/2018 | | FAIL |
Josh Bogle
|
|
|
need floors plans, structural connections at corners, WUI details
|
1st review completed | | | 10/16/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 10/15/2018 | 10/15/2018 | 10/15/2018 | P | DONE |
Katelyn Menuge
|
|
|
|
Routing PW Grading-Hillside | 10/15/2018 | | 10/15/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Application received | | 10/15/2018 | | | |
|
|
|
|