First Notice | | 4/19/2019 | 4/15/2019 | | DONE |
|
|
|
This permit finaled on the web by Lloyd Cox
|
BLD-Final | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Mike Jordan
|
|
|
Lloyd Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | A | PASS |
Mike Jordan
|
|
|
Lloyd Phone #: ###-####. All issues have been resolved.
|
Telephone call | | | 4/9/2019 | | DONE |
|
|
|
Called Mike Jordan. He did not see any mechanical. No mechanical permit needed.
|
Permanent Occupancy | | | 4/9/2019 | | DONE |
|
|
|
|
BLD-Final | 4/4/2019 | 4/5/2019 | 4/5/2019 | P | NR |
Mike Jordan
|
|
|
Call 30 minutes ahead // Lloyd Phone #: ###-####
|
FIRE-Final Inspection | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | FAIL |
Mark Scharfen
|
|
|
Conducted fire life safety inspection. Existing office door hardware needs to be changed to latch (they currently are round).Rear door e-light failed. Missing exit sign in hall (had paper placard on wall at end of hall). Rear door is a double door. One door has crash bar, 2nd door has flush slide bolts to keep door closed. After talking with Carl Madsen about storage double doors, the flush bolt is ok because of there not being any door hardware on the inoperable door. Sent a text to Lloyd.
Call 30 minutes ahead // Lloyd Phone #: ###-####
|
FIRE-Final Inspection | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | CANC |
Troy Cobbley
|
|
|
Lloyd Phone #: ###-####
|
BLD-Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Mike Jordan
|
|
|
Lloyd Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Mike Jordan
|
|
|
Loyd Phone #: ###-####. Interior wood framed walls ok.
|
Issue PAID IN FULL permit | | | 1/28/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/22/2019 | 1/22/2019 | 1/25/2019 | | PASS |
Javier Guzman
|
|
|
1/25 L2 Behavioral Health ePlan
|
Routing - PLAN CHECK | 1/22/2019 | | 1/25/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 1/25/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/25/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/25/2019 | | DONE |
|
|
|
MET
NEED
GC FORM
REVISED VALUE
|
Intake Approval | | | 1/17/2019 | | PASS |
|
|
|
|
Intake Approval | | | 12/5/2018 | | FAIL |
Joe Bruce
|
|
|
1. Keynote #18 on sheet A1.0 still states a new exterior door. This will still require a DR approval. If no new exterior doors are being replaced, this must be clearly noted on the plans. Provide letter of approval from Planning and Zoning for the removal of the exterior double door and infill with wall and single door. Any exterior modifications to a building require P&Z approval. Please contact Katelyn Menuge @ ###-#### kmenuge@cityofboise.org
|
Plan Reviewer's activity | | | 10/17/2018 | | DONE |
Joe Bruce
|
|
|
Address is 92 S Cole Road **JHB**
|
Intake Approval | | | 10/17/2018 | | FAIL |
|
|
|
1. Sheets A0.0 does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block. Verify all sheets have the required space for city approval stamp. Download the submittal standards here: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2. Provide letter of approval from Planning and Zoning for the removal of the exterior double door and infill with wall and single door. Any exterior modifications to a building require P&Z approval. Please contact Katelyn Menuge @ ###-#### kmenuge@cityofboise.org
|
Application received | | | 10/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 15 2018 3:05PM
|