BLD-Final | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/24/2019 | 5/24/2019 | 5/24/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.14
|
BLD-Final | 5/23/2019 | 5/23/2019 | 5/23/2019 | P | NR |
Brandon Shaw
|
|
|
Need PLM final...
|
BLD-Final | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
PubWorks Occupancy Approval | 5/23/2019 | 5/23/2019 | 5/23/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PART |
Brandon Shaw
|
|
|
Provide strap at break in double top plate, single garage, right side bearing wall... Per plans- DSC connectors to be installed per Engineering... Need Fire sprinkler tenting approval for attic area sprinklers, before covering...
|
BLD-Other | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress.
|
BLD-Foundation | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 11/28/2018 | 11/29/2018 | 11/29/2018 | P | NR |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 11/27/2018 | 11/28/2018 | 11/28/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 11/27/2018 | 11/27/2018 | 11/27/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 11/15/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/7/2018 | | |
|
|
|
|
Routing - PLAN CHECK | 11/7/2018 | | 11/7/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/7/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 10/16/2018 | | 11/7/2018 | | DONE |
Michael Hanson
|
|
|
11/02 #404 L2 ePlan. 1st review completed - Structural conflicts between engineering plans and designer plans. See changemark comments in ePlan. MDH
|
Routing - PLAN CHECK | 10/16/2018 | | 11/1/2018 | | FAIL |
Michael Hanson
|
|
|
Structural conflicts between engineering plans and designer plans. See changemark comments in ePlan. MDH
|
1st review completed | | | 11/1/2018 | | FAIL |
Michael Hanson
|
|
|
Structural conflicts between engineering plans and designer plans. See changemark comments in ePlan. MDH
|
Routing - FIRE | 10/16/2018 | 10/16/2018 | 10/19/2018 | | PASS |
Tim Frost
|
|
|
NFPA 13 D Sprinkler System is Required.
|
Route to Impact Fee Review | 10/16/2018 | 10/19/2018 | 10/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 10/16/2018 | | 10/17/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Routing - MECHANICAL | 10/16/2018 | | 10/17/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 10/16/2018 | | 10/17/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/16/2018 | | 10/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/16/2018 | | 10/16/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 10/16/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/16/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 10/16/2018 | | 10/16/2018 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 10/15/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 15 2018 3:54PM
|