Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD18-03801
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 500
Project NameCordell & Cordell - Suite 500
Customer Number 
ePlanReviewYes
Description
(CORDELL & CORDELL – US BANK BUILDING – SUITE #500) Permit is to remodel an existing 2,752 sq. ft. business space within the 5th floor of the existing high rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create (2) offices, a conference room, a break/print room, a reception area, a waiting room and a storage/IT room, select new door/door frames, select new interior window, millwork, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 2/10/20193/11/2019 DONE
mailed 3-12-19
Permanent Occupancy  1/31/2019 DONE
BLD-Final1/29/20191/29/20191/29/2019PPASS
DetailsDave Hannah
Laren Phone #: ###-####
FIRE-Final Inspection1/28/20191/29/20191/29/2019PPASS
DetailsTroy Cobbley
Life safety passed

Larren Phone #: ###-####
FIRE-Final Inspection1/24/20191/28/20191/28/2019AFAIL
DetailsTroy Cobbley
Provide ceiling tile, provide testing of the exit signs/emergency lights, repair the exit signs in the elevator lobby, provide fire alarm plan as-builts

Larren Phone #: ###-####
BLD-Framing/Rough-in11/20/201811/21/201811/21/2018APART
DetailsMike Jordan
Larin Phone #: ###-####. Inerior steel stud framed walls ok. No approved plans on site.
Print Occupancy Form  11/2/2018 DONE
Issue PAID IN FULL permit  11/2/2018 DONE
Plan assigned to (JG)10/18/201810/18/201810/25/2018 PASS
DetailsJavier Guzman
10/24 L1 Cordell & Cordell ePlan
Routing - PLAN CHECK10/18/2018 10/25/2018 PASS
DetailsJavier Guzman
1st review completed  10/25/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/25/2018 DONE
Permit Ready to Issue  10/25/2018 DONE
MET
NEED
GC FORM REVISED VALUE
Routing - Addressing10/18/2018 10/19/2018 PASS
DetailsDoug Chausow
Suite 500
Routing - PUBLIC WORKS10/18/2018 10/19/2018 PASS
DetailsRita DeYoung
Intake Approval  10/18/2018 PASS
DetailsJavier Guzman
Application received  10/16/2018 DONE
Application submitted via PDS Online on Oct 16 2018 10:50AM