Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD18-03805
StatusFinaled
Name CLEARSPAN CARPENTRY
Site Address 425 E BRAEMERE RD
Project NameBodnar Kitchen
Customer Number 
ePlanReviewNo
Description
Permit for a Kitchen remodel that also involves structural changes to a beam between the Living & Entry. Work will require new footing(s). All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/23/201910/24/201910/24/2019APASS
DetailsJim Storey
David Phone #: ###-####
DOC - Permit Finaled10/24/201910/24/201910/24/2019PPASS
DetailsJim Storey
BLD-Aging Inspection10/2/201910/2/201910/7/2019 PASS
DetailsTony Young
BLD-Conference10/2/201910/2/201910/2/2019PPEND
DetailsTony Young
aging status,, should be calling for a final next week?
BLD-Aging Inspection10/1/201910/1/201910/2/2019 PEND
DetailsTony Young
BLD-Aging Inspection5/17/20195/17/20195/21/2019 PEND
DetailsTony Young
BLD-Aging Inspection5/16/20195/16/20195/21/2019 PEND
DetailsTony Young
BLD-Energy code compliance5/19/20195/20/20195/20/2019APASS
DetailsTony Young
BLD-Energy code compliance1/2/20191/3/20191/3/2019APEND
DetailsBrandon Shaw
Pending Mech rough and cover appoval...
BLD-Energy code compliance1/2/20191/2/20191/2/2019PNR
DetailsTony Young
needs a mechanical permit and inspection
BLD-Energy code compliance12/31/20181/2/20191/2/2019APART
DetailsTony Young
David Phone #: ###-####,,, seal package ok
BLD-Wall cover12/31/201812/31/201812/31/2018PPASS
DetailsTony Young
David Phone #: ###-####,, frame ok,, ok to insulate
Routing Walk-In (BLD)10/24/201810/24/201810/24/2018PPASS
DetailsJosh Bogle
Plan assigned to (JAB) Josh10/23/201810/23/201810/24/2018 PASS
DetailsJosh Bogle
10/29 remodel, paper
Routing PW Grading-Hillside10/23/2018 10/24/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing - PLAN CHECK10/23/2018 10/24/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  10/24/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/24/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/24/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  10/24/2018 DONE
Issue PAID IN FULL permit  10/24/2018 DONE
Routing Walk-In (BLD)10/23/201810/23/201810/23/2018APASS
DetailsJosh Bogle
took in as a level two for Hillside review
Routing Walk-In (BLD)10/17/201810/17/201810/17/2018AFAIL
DetailsBrian McGowan
See notes in Activities
Routing - PLAN CHECK10/17/2018 10/17/2018 FAIL
DetailsBrian McGowan
Needs Engineering for new HILLSIDE FOOTINGS, needs to provide drawings for all the modifications he is doing to the home. He only brought in existing drawings. I also asked him to have the engineer verify the connection of the roof structure to the new raised beam (roof is handstacked).
1st review completed  10/17/2018 FAIL
DetailsBrian McGowan
Application received 10/17/2018