BLD-Final | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2019 | 10/24/2019 | 10/24/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/2/2019 | 10/2/2019 | 10/7/2019 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PEND |
Tony Young
|
|
|
aging status,, should be calling for a final next week?
|
BLD-Aging Inspection | 10/1/2019 | 10/1/2019 | 10/2/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/17/2019 | 5/17/2019 | 5/21/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/16/2019 | 5/16/2019 | 5/21/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 5/19/2019 | 5/20/2019 | 5/20/2019 | A | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PEND |
Brandon Shaw
|
|
|
Pending Mech rough and cover appoval...
|
BLD-Energy code compliance | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | NR |
Tony Young
|
|
|
needs a mechanical permit and inspection
|
BLD-Energy code compliance | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | PART |
Tony Young
|
|
|
David Phone #: ###-####,,, seal package ok
|
BLD-Wall cover | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | PASS |
Tony Young
|
|
|
David Phone #: ###-####,, frame ok,, ok to insulate
|
Routing Walk-In (BLD) | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 10/23/2018 | 10/23/2018 | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
10/29 remodel, paper
|
Routing PW Grading-Hillside | 10/23/2018 | | 10/24/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 10/23/2018 | | 10/24/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/24/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/23/2018 | 10/23/2018 | 10/23/2018 | A | PASS |
Josh Bogle
|
|
|
took in as a level two for Hillside review
|
Routing Walk-In (BLD) | 10/17/2018 | 10/17/2018 | 10/17/2018 | A | FAIL |
Brian McGowan
|
|
|
See notes in Activities
|
Routing - PLAN CHECK | 10/17/2018 | | 10/17/2018 | | FAIL |
Brian McGowan
|
|
|
Needs Engineering for new HILLSIDE FOOTINGS, needs to provide drawings for all the modifications he is doing to the home. He only brought in existing drawings. I also asked him to have the engineer verify the connection of the roof structure to the new raised beam (roof is handstacked).
|
1st review completed | | | 10/17/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 10/17/2018 | | | |
|
|
|
|