BLD-Final | 7/11/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 7/12/2019 | 7/12/2019 | 7/12/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | NR |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
Plan assigned to (RDP) | 5/21/2019 | 5/21/2019 | 6/10/2019 | | DONE |
Rob Patrick
|
|
|
06/03 sfd L1 ePlan
|
Routing - PLAN CHECK | 5/21/2019 | | 5/21/2019 | | PASS |
Rob Patrick
|
|
|
Please add 1 hour review time for Plan Mod.
|
Permit Ready to Issue | | | 5/21/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/21/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/21/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/21/2019 | | DONE |
|
|
|
plan mod accepted-added an extra bathroom-assigned to Rob P
|
BLD-Framing/Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Dave Hannah
|
|
|
|
Routing Walk-In (BLD) | 10/18/2018 | 10/18/2018 | 10/18/2018 | A | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 10/18/2018 | | 10/18/2018 | | PASS |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 10/18/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 10/18/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/17/2018 | 10/17/2018 | 10/17/2018 | A | FAIL |
Brian McGowan
|
|
|
Needs a wall section to detail how he is building up the floor.
|
1st review completed | | | 10/17/2018 | | FAIL |
Brian McGowan
|
|
|
Needs a wall section to detail how he is building up the floor.
|
Routing - PLAN CHECK | 10/17/2018 | | 10/17/2018 | | FAIL |
Brian McGowan
|
|
|
Needs a wall section to detail how he is building up the floor.
|
1st review completed | | | 10/17/2018 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 10/17/2018 | | | |
|
|
|
|