Second Notice | | 1/9/2020 | 1/29/2020 | | DONE |
|
|
|
This permit finaled on the web by Matt Forrester
|
First Notice | | 12/29/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
BLD-Final | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-####
|
Permanent Occupancy | | | 12/19/2019 | | DONE |
|
|
|
|
BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | PEND |
Dave Hannah
|
|
|
|
Telephone call | | | 11/21/2019 | | DONE |
|
|
|
Mailed a courtesy letter to Beniton letting them know the conditions that need to be met in order to final this permit
|
BLD-Conference | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PEND |
Tony Young
|
|
|
Chase Phone #: ###-####// wanted Dave only
|
Temporary Occupancy | 10/3/2019 | 1/1/2020 | 10/3/2019 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | PART |
Tony Young
|
|
|
Chase Phone #: ###-####,, temp occ. ok, ok to move in, needs to make handrails and guardrails meet min. compliance, add as needed on existing, door signage, restroom dispensaries
|
FIRE-Final Inspection | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications (fire sprinklers are basement only), fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Exit signage/emergency lighting to be added in gym and exit path on level 2 (exterior exit, corridor has exit sign), added exit signs/emergency lighting to be verified during BLD final inspection. Per conversation with Ron Johnson, fire alarm system is controlled by main school fire panel, knox box for school will be utilized for this building, no other knox box required. Final life fire safety inspection for area of work complete.
will be verified on bChase Phone #: ###-####
|
Zoning Approval | 9/24/2019 | 9/24/2019 | 9/24/2019 | | DONE |
Cody Riddle
|
|
|
Improvements required for zoning sign-off are all complete.
|
BLD-Conference | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | DONE |
Tell Riley
|
|
|
Chase Phone #: ###-####//working on door hardware//new ramp complete//discussed existing doors to remain at first floor bathrooms(no changes indicated on plans)-opening widths narrow//
|
BLD-Framing/Rough-in | 7/17/2019 | 7/17/2019 | 7/17/2019 | P | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-####
|
BLD-Framing/Rough-in | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Dave Hannah
|
|
|
Chase Phone #: ###-#### second floor strapes ok
|
BLD-Conference | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Dave Hannah
|
|
|
Keith Phone #: ###-####
|
Print Occupancy Form | | | 4/3/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/3/2019 | | DONE |
|
|
|
|
Meeting | | | 4/2/2019 | | DONE |
|
|
|
school district came in to pay for permit fees. Informed them, no email for GC, that someone with Beniton Construction needs to sign the permit
|
Expiration Notice | 3/21/2019 | 4/11/2019 | 3/21/2019 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 1/25/2019 | | DONE |
|
|
|
Matt Forrester emailed the GC & cert of val-i emailed him back that we still needed the ACHD and the RP
|
OVERRIDE | | | 12/19/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 10/25/2018 | 10/25/2018 | 12/19/2018 | | PASS |
Carl D Madsen
|
|
|
Whittier Community Center (L-3)
|
Routing - PLAN CHECK | 12/6/2018 | | 12/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/6/2018 | | 12/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/19/2018 | | DONE |
|
|
|
all met-NEED
ACHD-met
RP-met
GC-met
Rev cert of val-met
|
Route to Impact Fee Review | 11/14/2018 | 11/17/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/14/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/25/2018 | | 11/14/2018 | | FAIL |
Carl D Madsen
|
|
|
KPFF
|
Routing - PLAN CHECK | 10/25/2018 | | 11/14/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/9/2018 | 11/9/2018 | 11/9/2018 | | PASS |
Erika Akin
|
|
|
Attached revised comments to case
|
Routing - FIRE | 10/25/2018 | 10/25/2018 | 11/9/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - ELECTRICAL | 10/25/2018 | | 10/30/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 10/29/2018 | | 10/29/2018 | | PASS |
Michael Zawacki
|
|
|
|
Routing - MECHANICAL | 10/25/2018 | | 10/29/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 10/25/2018 | | 10/26/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 10/25/2018 | | 10/26/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLUMBING | 10/25/2018 | | 10/26/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 10/25/2018 | | 10/26/2018 | | PASS |
Cody Riddle
|
|
|
|
Routing - Addressing | 10/25/2018 | | 10/25/2018 | | PASS |
Doug Chausow
|
|
|
11/9/18 Updated address to 255 N 29th St.
|
Routing - PUBLIC WORKS | 10/25/2018 | | 10/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 10/25/2018 | | 10/25/2018 | | PASS |
Josh Wilson
|
|
|
No DR required, not in DR overlay
|
Routing PW Solid Waste | 10/25/2018 | | 10/25/2018 | | PASS |
Evan Carpenter
|
|
|
No new solid waste containers are proposed or approved.
|
Intake Approval | | | 10/22/2018 | | PASS |
|
|
|
|
Application received | | | 10/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 17 2018 2:45PM
|