Information based on query as of Thursday, July 25, 2024.
Permit Information
Permit NumberBLD18-03818
StatusIssued
Name HELLMANN CONSTRUCTION CO INC
Site Address 848 W MAIN ST
Project NameEastman Parking Garage
Customer Number 
ePlanReviewYes
Description
(CCDC BIKE SHELTER – EASTMAN PARKING GARAGE BUILDING) Permit to remodel an existing automobile parking garage by adding a new 560 sq. ft. bicycle parking station within main level of the parking garage. Approval is contingent upon adhering to the approved plans on file and attached engineering. Work to include: construction of footing/foundation, concrete slab, steel columns, chain link fencing, door/door frame, light fixtures, electrical work and interior finishes in compliance with Ch. 8 of the current IBC. This building does not have a fire sprinkler system. Note: special inspection is required, see attached form 310. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20196/7/20196/12/2019PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Foundation3/5/20193/11/20193/11/2019APASS
DetailsDave Hannah
pouring at 10 // Alia Phone #: ###-####
Print Occupancy Form  2/5/2019 DONE
Issue PAID IN FULL permit  2/5/2019 DONE
Plan assigned to (JG)12/4/201812/4/201812/20/2018 PASS
DetailsJavier Guzman
1st rev comp, CCDC Bike Shelter ePlan (pend 310 cover sheet) 12/14
Routing - PLAN CHECK12/14/2018 12/20/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/20/2018 DONE
Permit Ready to Issue  12/20/2018 DONE
NEED- all met
GC
Rev cert of val
Route to Impact Fee Review12/5/201812/8/201812/5/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  12/5/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK10/30/2018 12/5/2018 FAIL
DetailsCarl Westfall
Plan assigned to (CJW)10/30/201810/30/201812/4/2018 DEFR
DetailsCarl Westfall
11/14/18 (L3 - 15 days) (ePlan - 18 sheets) CCDC Bike Shelter
Routing Off Site - STRUCTURAL10/30/2018 12/4/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland

Routing - Erosion and Sediment10/30/2018 11/2/2018 PASS
DetailsMichael Zawacki
Being built in existing structure.
Routing - FIRE10/30/201810/30/201811/1/2018 PASS
DetailsErika Akin
No comments attached. Inspector to field verify life safety and fire extinguisher avalable within 75 feet travel distance.
Routing - Design Review10/30/2018 11/1/2018 PASS
DetailsJosh Wilson
Interior to structure, No DR approval required.
Routing - Addressing10/30/2018 10/30/2018 PASS
DetailsDoug Chausow
Intake Approval  10/25/2018 PASS
Intake Approval  10/18/2018 FAIL
DetailsJoe Bruce
Application received  10/17/2018 DONE
Application submitted via PDS Online on Oct 17 2018 4:45PM