Second Notice | | 7/20/2019 | 7/23/2019 | | DONE |
|
|
|
received 1st notice through email
|
Print Statement | | | 7/23/2019 | | DONE |
|
|
|
Sent Woodland Kids the fees due from firs notice
|
First Notice | | 6/22/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
Print Occupancy Form | | | 6/12/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/12/2019 | | DONE |
|
|
|
|
BLD-Final | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
Mike Jordan
|
|
|
Allen Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | CANC |
Troy Cobbley
|
|
|
Cody Phone #: ###-#### Inspection cancelled via mobile web on Thursday, June 06, 2019.
|
FIRE-Final Inspection | 6/6/2019 | 6/6/2019 | 6/6/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
|
CHANGE STATUS TO (ISS) | | | 6/4/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/4/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/16/2019 | 5/16/2019 | 5/22/2019 | | PASS |
Carl Westfall
|
|
|
plan mod - Woodland Kids (routed to mechanical)
|
Routing - MECHANICAL | 5/17/2019 | | 5/22/2019 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 5/22/2019 | | PASS |
|
|
|
Plan mod review approved
|
Permit Ready to Issue | | | 5/22/2019 | | DONE |
|
|
|
PLAN MOD do not reissue, fees due
|
Plan Reviewer's activity | | | 5/17/2019 | | DONE |
|
|
|
Plan mod plan intake review approved
|
Routing - PLAN CHECK | 5/17/2019 | | 5/17/2019 | | PASS |
Carl Westfall
|
|
|
2nd plan mod review approved
|
Plan Modification Accepted | | | 5/16/2019 | | DONE |
|
|
|
added fire dampers
|
BLD-Framing/Rough-in | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####. BAse layers for 3hr. fire barrier and partial 2nd. layer.
|
BLD-Conference | 4/24/2019 | 4/24/2019 | 4/24/2019 | P | DONE |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Went over UL assembly for 3hr. fire barrier with contractor.
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PART |
Mike Jordan
|
|
|
Todd Phone #: ###-####. Interior steel stud framed walls, except for 3hr. hr fire barier ok for cover. Pending plumbing rough in inspection.
|
BLD-Conference | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | DONE |
Mike Jordan
|
|
|
Call half hour before to meet // Allen Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PART |
Mike Jordan
|
|
|
Jr. Phone #: ###-####. Interior steel atud framed walls for 3hr. fire barier.
|
CHANGE STATUS TO (ISS) | | | 4/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/11/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/8/2019 | 4/8/2019 | 4/9/2019 | | PASS |
Carl Westfall
|
|
|
Plan Mod - Woodland Kids (plan mod plan intake approved)
|
Routing - PLAN CHECK | 4/9/2019 | | 4/9/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake and review approved
|
Plan Reviewer's activity | | | 4/9/2019 | | PASS |
|
|
|
The plan mod review was approved
|
Permit Ready to Issue | | | 4/9/2019 | | DONE |
|
|
|
PLAN MOD - DO NOT REISSUE
|
Plan Modification Accepted | | | 4/8/2019 | | DONE |
|
|
|
removing powered exhaust on two of the existing hvac units
|
Issue PAID IN FULL permit | | | 4/1/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
Left message for Richard Wilmot to get an updated address. informed him I tried to send a letter about this permit expiring next month
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
owner called and wants HVAC Co to work this weekend but the building permit has not been picked up. We still need ACHD, GC & rev cert of val so i told her the HVAC couldn't have his permit so no work should be done until the building permit is issued
|
Expiration Notice | 3/21/2019 | 4/11/2019 | 3/21/2019 | | DONE |
Brittany Hill
|
|
|
|
Permit Ready to Issue | | | 2/11/2019 | | DONE |
|
|
|
ALL MET
Need
ACHD
MET (WALK IN)
GC Form
Revised Value
|
Plan assigned to (CJW) | 12/6/2018 | 12/6/2018 | 2/9/2019 | | PASS |
Carl Westfall
|
|
|
(2nd done) 12/21/18 (L3 - 15 days) (ePlan - 26 sheets) Woodland Kids (L-3) (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2019 | | DONE |
|
|
|
|
Routing - FIRE | 2/2/2019 | 2/2/2019 | 2/7/2019 | | PASS |
Mark Scharfen
|
|
|
2nd IFC Code review complete. 02.07.2019
Resubmittal. The foam plastic trees were removed from the drawings. Drawings relating to the trees were deleted, including a Fire changemark.
|
Routing - PLAN CHECK | 2/1/2019 | | 2/2/2019 | | PASS |
Carl Westfall
|
|
|
2nd IBC plan review completed and approved
|
Plan resubmittals received | | | 2/1/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/5/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/3/2019 | 1/6/2019 | 1/4/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 12/6/2018 | 12/6/2018 | 1/2/2019 | | FAIL |
Mark Scharfen
|
|
|
01/02 Woodland Kids L3
Attached comments to case and emailed architecht.
|
1st review completed | | | 1/2/2019 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2018 | | DONE |
|
|
|
Left a message that an early start permit would not be issued since there are alot of things that need to be corrected on the drawings.
|
Routing - PLAN CHECK | 12/6/2018 | | 12/20/2018 | | FAIL |
Carl Westfall
|
|
|
Time frame not met by Fire.
|
Routing - MECHANICAL | 12/6/2018 | | 12/10/2018 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/6/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/6/2018 | | 12/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 12/6/2018 | | 12/7/2018 | | PASS |
Daryl Spivey
|
|
|
See redline remarks. Per plan and ISPC.
|
Routing - PLANNING | 12/6/2018 | | 12/7/2018 | | PASS |
Nicolette Womack
|
|
|
Indoor Recreation. Parent supervision. No child watch.
|
Intake Approval | | | 12/3/2018 | | PASS |
|
|
|
|
Intake Approval | | | 11/16/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
1. Provide plan sheet E0.0, E2.0L and E3.0 stamped, signed and dated with an Idaho licensed engineer
2. The previous request for design engineering of the tree not complete. Need to address the following: stamped tree design plans from an Idaho licensed engineer, Tree design calculation and tree attachments, rope style guard design.
|
Intake Approval | | | 10/25/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Provide planning and zoning letters for the exterior work.
• Provide emergency lighting locations
• Provide fire extinguisher locations
• Provide Lighting fixture schedule where new lighting is being installed to list fixture type, wattage, ballast/bulb type, fixture count, switching requirements, switching to include daylight area switching and automatic lighting control shutoff for tenant spaces over 5000 sq. ft.
• Provide engineering calculations and engineered plans for the large center tree and platform concept (take into consideration accessibility standards to this tree in your redesign of the tree)
|
Application received | | | 10/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2018 3:06PM
|