Telephone call | | | 7/12/2019 | | DONE |
|
|
|
Called Chris LaBorde to follow up on final values discrepancies
|
Telephone call | | | 7/2/2019 | | DONE |
|
|
|
emailed Chris LaBorde asking for clarification on why there are plumbing values when no plumbing permits were pulled for the permit.
|
Second Notice | | 5/16/2019 | 6/10/2019 | | DONE |
|
|
|
mailed 6-11
|
First Notice | | 4/21/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
BLD-Final | 4/10/2019 | 4/11/2019 | 4/11/2019 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Ok for perm occ.
|
Permanent Occupancy | | | 4/11/2019 | | DONE |
|
|
|
|
BLD-Wall cover | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Mike Jordan
|
|
|
eric Phone #: ###-####. Ok to cover patio area toungue and groove planking is acceptable.
|
BLD-Ceiling Grid Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 | P | CANC |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Energy code compliance | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Patio enclosure. Walls only ok to cover. Per the report for foam insulation, it appears that a thermal barrier is required. Will need to provide a thermal barrier or show that the 3/4 inch tongue and grove cedar will meet a 15minute barrier per NFPA 275.
|
BLD-Final | 3/13/2019 | 3/15/2019 | 3/15/2019 | P | NR |
Jim Sly
|
|
|
for temporary occupancy // Eric Phone #: ###-#### Need Electrical final.......CDHD says that they don't want to come out.....told them.....need to verify that somehow.
|
FIRE-Final Inspection | 3/13/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete (escutcheon will be installed when painting is finished) no fire sprinkler modifications, fire extinguisher are placed with current inspection tags, hood suppression system has a current inspection tag, fire sprinkler system has a current inspection tag. Final life fire safety inspection for area of work complete.
for temporary occupancy // Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2019 | 3/12/2019 | 3/12/2019 | P | PART |
Mike Jordan
|
|
|
patio // Eric Phone #: ###-####. Exterior wood framed walls for patio enclosure. Needs to add the missed A34's and needs electrical rough in inspection.
|
BLD-Wall Bracing | 3/8/2019 | 3/11/2019 | 3/11/2019 | P | CANC |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####. Interior framing for new wall and header for sliding glass door ok
|
BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | PART |
Mike Jordan
|
|
|
Eric if not there ask for Chris Laborde Phone #: ###-####. Interior wood framed wall for new sliding glass doors. Ok to one side. Needs to provide the attached engineering.
|
BLD-Energy code compliance | 3/6/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Mike Jordan
|
|
|
by the foundation // Eric Phone #: ###-####
|
BLD-Concrete | 2/28/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Mike Jordan
|
|
|
call for access=footing and wall- Eric Phone #: ###-####. Footing and stemwall for patio enclosure. Ok to place pending special inspection.
|
Print Occupancy Form | | | 2/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/13/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 11/29/2018 | 11/29/2018 | 12/20/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 12/05 L3 Tucanos ePlan 12/18
|
Routing - PLAN CHECK | 12/18/2018 | | 12/20/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/20/2018 | | DONE |
|
|
|
both have been met-NEED
GC
Rev cert of val
|
Routing - MECHANICAL | 12/18/2018 | | 12/18/2018 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 11/29/2018 | | 12/4/2018 | | PASS |
Erika Akin
|
|
|
11/28/2018 Enclosing existing covered patio with new storefront to add 530 square feet of dining room. Seperate fire protection permits may be required.
|
Routing - Design Review | 11/29/2018 | | 11/30/2018 | | PASS |
Josh Wilson
|
|
|
Ok per CZC18-00261
|
Routing - PLAN CHECK | 11/28/2018 | | 11/30/2018 | | FAIL |
Javier Guzman
|
|
|
Is the patio conditioned? Is the envelope required to comply? Safety glass required.
|
Plan assigned to (CJW) | 10/30/2018 | 10/30/2018 | 11/29/2018 | | DEFR |
Carl Westfall
|
|
|
* 11/14/18 (L3 - 15 days) (ePlan - 6 sheets) Tucanos (L-3)
|
Routing - PLAN CHECK | 10/30/2018 | | 11/28/2018 | | FAIL |
Carl Westfall
|
|
|
Bacause of workload, this project has not had an initial review. It was routed back to the applicant so that he could upload revised drawings. Route the resubmittal back to all applicable agencies even if they approved it the 1st time.
|
Plan resubmittals requested | | | 11/28/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/28/2018 | | DONE |
|
|
|
|
1st review completed | | | 11/28/2018 | | DONE |
|
|
|
|
Routing - FIRE | 10/30/2018 | 10/30/2018 | 11/23/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - C.D.H | 10/30/2018 | | 11/1/2018 | | PASS |
Carl Westfall
|
|
|
Matt McDonald
|
Routing - Addressing | 10/30/2018 | | 10/30/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2018 | | 10/30/2018 | | PASS |
Morgan Webb
|
|
|
NO NEW FEES
|
Routing - Design Review | 10/30/2018 | | 10/30/2018 | | FAIL |
Andrea Tuning
|
|
|
A Design Review application and approval is required for any exterior buildign modifications. Please submit a Design Review applciation for these changes. Form #161
|
Intake Approval | | | 10/25/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/23/2018 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Application received | | | 10/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2018 4:27PM
|