BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Bill Phone #: ###-####
|
DOC - Permit Finaled | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.17
|
BLD-Ceiling Grid Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Brandon Shaw
|
|
|
sheet rock on soffets
|
BLD-Energy code compliance | 3/8/2019 | 3/8/2019 | 3/9/2019 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Wall brace and Framing rough -in... OK to insulate...
|
CHANGE STATUS TO (ISS) | | | 2/21/2019 | | DONE |
|
|
|
doc finaled permit by accident
|
BLD-Conference | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | DONE |
Brandon Shaw
|
|
|
Dill Phone #: ###-####
|
DOC - Permit Finaled | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Foundation | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
OVERRIDE | | | 11/14/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/25/2018 | 10/25/2018 | 11/14/2018 | | DONE |
Brian McGowan
|
|
|
11/13 sfd L2 ePlan
|
Routing - PLAN CHECK | 10/26/2018 | | 11/14/2018 | | PASS |
Brian McGowan
|
|
|
|
Issue PAID IN FULL permit | | | 11/14/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2018 | | DONE |
|
|
|
|
1st review completed | | | 11/14/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/14/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/26/2018 | 10/29/2018 | 10/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Flood Plain | 10/26/2018 | | 10/29/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 10/26/2018 | | 10/29/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/26/2018 | | 10/26/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/26/2018 | | 10/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2018 | | 10/26/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/25/2018 | | FAIL |
|
|
|
prescriptive needs to be on one of the plan sheets
|
Intake Approval | | | 10/25/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/25/2018 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/23/2018 | | FAIL |
|
|
|
Need prescriptive energy or res check (need r values) also need the LMOR flood plain letter
|
Application received | | | 10/19/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 19 2018 9:42AM
|