Permit Information
Permit NumberBLD18-03851
StatusIssued
Name RRC CONTRACTORS
Site Address 5610 W GAGE ST Unit: STE B
Project NameDaVita Tablerock Office/Confer
Customer Number 
ePlanReviewNo
Description
(DAVITA TABLE ROCK DIALYSIS CENTER)(SUITE B) Remodel of an existing 790 sq. ft. space that was previously used by the current tenant as an exam room, nurse station, and storage. The remodeled space includes an office, staff toilet room, and conference room per approved plans. The existing space was constructed under BLD16-00170 and has a valid Certificate of Occupancy. Work to include removing interior non-bearing walls & doors, new interior non-bearing walls, new doors, plumbing, minor mechanical, electrical, and new interior finish that meets IBC chapter 8 requirements. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  1/25/2019 DONE
BLD-Final1/23/20191/24/20191/24/2019APASS
DetailsJim Sly
Please call 30 minutes in advance so I can meet you on site. Thanks. Phone #: ###-#### Inspection requested via web by Don Walker
FIRE-Final Inspection1/23/20191/23/20191/23/2019PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire xtinguisher will be mounted in discussed location. Final life fire safety inspection for area of work complete.

Please call 30 minutes in advance so I can meet you on site. Thanks. Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Final1/22/20191/23/20191/23/2019ANR
DetailsJim Sly
Please call 30 minutes in advance so I can meet you on site. Thanks. Phone #: ###-#### Inspection requested via web by Don Walker
Need Fire/life.......Sprinkler and Alarm........
BLD-Ceiling Grid Inspection1/10/20191/10/20191/11/2019PPASS
DetailsJim Sly
Please call 30 minutes in advance so I can meet you there. Thanks. Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Framing/Rough-in11/27/201811/27/201811/27/2018PPASS
DetailsMike Jordan
Please call 30 minutes prior to inspection so I can make sure to be on site.
Thanks. Phone #: ###-#### Inspection requested via web by Don Walker
Route to Impact Fee Review11/8/201811/11/201811/9/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  11/9/2018 DONE
MET
NEED
GC
Rev Cert of val (gc turned in plans and signed app. blh 11-918)
please make sure the impact fees are signed off
Inspection Record Card- Bld  11/9/2018 DONE
Issue PAID IN FULL permit  11/9/2018 DONE
Plan assigned to (JHB)10/19/201810/19/201811/8/2018 PASS
DetailsJoe Bruce
11/07 (L2) - DaVita Tablerock Office/Confer
Routing - FIRE 10/19/201811/8/2018 PASS
DetailsErika Akin
Attached comments to case and plans
1st review completed  11/8/2018 DONE
DetailsJoe Bruce
Case Summary (BLD)  11/8/2018 DONE
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  11/8/2018 DONE
Routing - PLAN CHECK  11/6/2018 PASS
DetailsJoe Bruce
Attached Plan Review Report to documents. **JHB**
Routing - PLUMBING10/30/2018 10/31/2018 PASS
DetailsDan Ediger
Per plans and ISPC
MISC ACTIONS  10/30/2018 DONE
plans routed to fire by mistake on 10/22. On 10/30 routed to plumbing.
Routing - Addressing10/22/2018 10/22/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/19/2018 10/22/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/19/2018 DONE
Intake Approval  10/19/2018 PASS
DetailsJoe Bruce
Recd Pcfee & Taken To Pln CK  10/19/2018 DONE
Application received 10/19/2018