BLD-Final | 7/29/2019 | 7/29/2019 | 7/30/2019 | P | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
DOC - Permit Finaled | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
Zoning Approval | 7/26/2019 | 7/26/2019 | 7/26/2019 | | PASS |
Josh Wilson
|
|
|
Temp BND19-00135
|
BLD-Energy code compliance | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall Bracing | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Storey
|
|
|
Garage Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | CANC |
Jim Storey
|
|
|
After 3:00 please Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall Bracing | 4/3/2019 | 4/3/2019 | 4/3/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
Routing - MECHANICAL | 4/3/2019 | | 4/3/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Wall Bracing | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | FAIL |
Brandon Shaw
|
|
|
No corrections or plan revisions have been completed...
|
BLD-Footing | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Dave Hannah
|
|
|
call first please! gonna do a trench pour so forms will not be set up Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Footing | 3/28/2019 | 3/28/2019 | 3/28/2019 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Wall Bracing | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | FAIL |
Brandon Shaw
|
|
|
(3) 2x10's used for front entry PHF, plans call for (3) 11 7/8 Versa Lam- Need Engineering approval... Submit plan revision for as built- Doors, windows, and interior walls missing or moved... Up stairs 3rd bath omitted... Master bath re-arranged- tub and shower not as per plans- need floor truss Engineering approval... Interior shear panels not as per plans...
|
BLD-Conference | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Foundation | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-####
|
BLD-Footing | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Jim Storey
|
|
|
Jose Phone #: ###-#### need fil to grade out front footting coverage .
|
Issue PAID IN FULL permit | | | 2/5/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/31/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 10/25/2018 | 10/25/2018 | 1/31/2019 | | DONE |
Brian McGowan
|
|
|
11/07 sfd L1 ePlan- 1st Review Complete- 3rd Corrections required.
|
Routing - PLAN CHECK | 1/31/2019 | | 1/31/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/31/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/25/2019 | | 1/25/2019 | | FAIL |
Brian McGowan
|
|
|
Sheet A 4.1 was not modified
|
Routing - PLAN CHECK | 1/15/2019 | | 1/15/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 1/14/2019 | | 1/14/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 10/25/2018 | | 11/7/2018 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 11/7/2018 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 10/25/2018 | | 10/29/2018 | | FAIL |
Katelyn Menuge
|
|
|
Provide written approval from Idaho Power, stating the design meets all clearance requirements, and provide minimum dimensions of 15x25 feet for the private open space.
|
Route to Impact Fee Review | 10/25/2018 | 10/28/2018 | 10/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/25/2018 | | 10/26/2018 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/25/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/25/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/25/2018 | | PASS |
|
|
|
|
Routing - Addressing | 10/25/2018 | | 10/25/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/25/2018 | | 10/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Application received | | | 10/24/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 24 2018 10:23AM
|