Permit Information
Permit NumberBLD18-03900
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3029 N LANCASTER PL
Project Name 
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION - additional retaining walls JJN 11/12/19** *PLAN MODIFICATION - updated fire flow letter submitted no sprinklers required per LGM 05-6-19 JJN* **HILLSIDE** **WUI FOOTHILLS** **PASSES UA TRADE OFF** **FIRE SPRINKLERS NOT REQUIRED. LGM.** Permit for the construction of a new 3135 sq. ft., two story (first story 1934 sq. ft., second story 1201 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 276 sq. ft. of covered patio/porch and a 928 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. JJN. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201912/4/201912/4/2019PPASS
DetailsTony Young
Please give me 30 minutes heads up and I will meet you there thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled12/4/201912/4/201912/4/2019PPASS
DetailsTony Young
BLD-Final12/3/201912/3/201912/4/2019PPASS
DetailsTony Young
Please give me 30 minutes heads up and I will meet you there thank you Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Final11/15/201911/15/201911/15/2019PPART
DetailsTony Young
30 minutes notice please Phone #: ###-#### Inspection requested via web by bryan murdoch,, needs letter of ok from the engineering on the cable guardrail and the final electrical on the spa
PubWorks Occupancy Approval11/15/201911/15/201911/15/2019 DONE
DetailsMelissa Jannusch

A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
OVERRIDE  11/12/2019  
Plan assigned to (J_N)10/17/201910/17/201911/12/2019 DONE
DetailsJenny Nelson
Plan mod, waiting for hillside review
Telephone call  11/12/2019 DONE
Left voicemail for Doug to inform him the plan mod is approved and what fees are due.
CHANGE STATUS TO (ISS)  11/12/2019 DONE
Routing PW Grading-Hillside11/12/2019 11/12/2019 PASS
DetailsMelissa Jannusch
PLAN MOD APPROVED.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PUBLIC WORKS11/12/2019 11/12/2019 PASS
DetailsCandy A. Nichols
Case Summary (BLD)  11/12/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/12/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/12/2019 DONE
Plan mod approved
Plan resubmittals received  11/6/2019 DONE
DetailsJenny Nelson
4 copies of retaining wall detail, 4 copies of C1 grading and drainage plan, 2 copies of structural calculations recieved by JJN taken to MMJ
Routing - PLAN CHECK11/6/2019 11/6/2019 PASS
DetailsJenny Nelson
Routing - PLAN CHECK10/17/2019 11/5/2019 FAIL
DetailsJenny Nelson
Site plan doesn't match, questions about hot tub
Routing - PLANNING10/17/2019 11/5/2019 PASS
DetailsNicolette Womack
Retaining Walls exposed height in front yard setback shall not exceed 3'.
Routing PW Grading-Hillside10/21/2019 11/1/2019 FAIL
DetailsMelissa Jannusch
PLAN MOD. see e-mail to applicant
Routing - PUBLIC WORKS11/1/2019 11/1/2019 FAIL
DetailsCandy A. Nichols
SEE HILLSIDE REVIEW FOR FAIL
Plan resubmittals received  10/22/2019 DONE
two copies of strlix engineering letter. taken to jenny
BLD-Other10/21/201910/21/201910/21/2019PNR
DetailsTony Young
Brain Phone #: ###-####,, walk through only,, needs hillside, trades,,hand rails, guards etc..
BLD-Other10/17/201910/18/201910/18/2019PCANC
DetailsTony Young
Courtesy inspection I do not have my handrail complete but need to make sure I have everything else thank you Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
Plan Modification Accepted  10/17/2019 DONE
Plan mod for Retaining wall. Two copies of C1 grading, a101 site plan, a201 & a202 elevations, s101 foundation and footings page and three copies of Geotech inspection letter stamped and taken to plan reviewer.
BLD-Energy code compliance6/5/20196/6/20196/6/2019APASS
DetailsDave Hannah
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in6/3/20196/3/20196/3/2019PPART
DetailsTony Young
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch,, minor corrections,, ok to insulate
BLD-Wall Bracing5/6/20195/7/20195/7/2019PPART
DetailsTony Young
Thanks. Jim the Framer will be there. Phone #: ###-#### Inspection requested via web by bryan murdoch,, needs to get designer ok for changes from plan,, missed hold downs?,, shear panel size changes,, nailing on other areas ok
OVERRIDE  5/6/2019  
Plan assigned to (J_N)5/3/20195/3/20195/6/2019 DONE
DetailsJenny Nelson
Plan mod - update fire flow letter
Routing - FIRE5/3/20195/3/20195/6/2019 PASS
DetailsLee G Meredith
05/10 Lancaster Pl Residential LM resubmittal

Revised fire flow is adequate. No sprinklers required.
Routing - PLAN CHECK5/6/2019 5/6/2019 PASS
DetailsJenny Nelson
Plan mod for fire flow letter, fire passed. no plan review fee needed as no review required from JJN.
Telephone call  5/6/2019 DONE
called bryan to let know permit plan mod is ready=-left message on his
Permit Ready to Issue  5/6/2019 DONE
CHANGE STATUS TO (ISS)  5/6/2019 DONE
no fee for plan mod
Plan Modification Accepted  5/3/2019 DONE
plan mod-letter from Suez -took to Jenny N
BLD-Foundation3/18/20193/19/20193/19/2019APART
DetailsTony Young
As early as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru,, work in progress
BLD-Footing3/12/20193/12/20193/12/2019PPART
DetailsTony Young
ready around 3pm.. Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate... work in progress
BLD-Footing3/11/20193/11/20193/12/2019PNR
DetailsTony Young
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
BLD-Footing3/11/20193/12/20193/12/2019ANR
DetailsTony Young
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
PubWorks Subgrade Approval3/11/20193/11/20193/11/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  3/5/2019 DONE
Plan assigned to (J_N) 10/24/20181/11/2019 DONE
DetailsJenny Nelson
11/13 sfd L2 paper. 2nd review, passed building, failed planning and fire. 1st review done, master bed egress window width, beam MSRB4
Routing - PLANNING1/11/2019 1/11/2019 PASS
DetailsSue Cummings
Building moved outside setback. O.K. now
Case Summary (BLD)  1/11/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  1/11/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  1/11/2019 DONE
Inspection Record Card- Bld  1/11/2019 DONE
Telephone call  1/11/2019 DONE
Left a voicemail for Doug to inform the permit is ready and what fees are due.
Plan resubmittals received  1/8/2019 DONE
Resubmittals received 3 sets of sheet A-101-took to Jenny N
Routing PW Grading-Hillside1/2/2019 1/2/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PUBLIC WORKS12/19/2018 1/2/2019 PASS
DetailsAngela Hardy
Routing - FIRE11/14/201810/24/201812/28/2018 PASS
DetailsLee G Meredith
11/12 SFD L2 Paper

Needs fire flow letter from SUEZ.

SUEZ letter received. Available fire flow is 1500 gpm. 1750 is required unless fire area is reduced to less than 3601 sq. ft. or fire sprinklers are provided.

1-9-19 Applicant resubmitted a new site plan that indicated fire sprinklers wil be provided.
Routing - PLAN CHECK12/28/2018 12/28/2018 PASS
DetailsJenny Nelson
Plan resubmittals received  12/20/2018 DONE
Reswubmittals received 2 sets of sheets A-101, A-102, S-101, 3 SUEZ letters & header info-took to Jenny
1st review completed  11/14/2018 FAIL
DetailsJenny Nelson
Master bed egress window width, verify beam MSRB4 with girder load.
Routing - Erosion and Sediment11/14/2018 11/14/2018 PASS
DetailsAndy J. Long
ESC plan and site map approved. Certified RP and PD designated. Site preparation inspection is REQUIRED prior to earthwork.
Routing - PLAN CHECK  11/14/2018 FAIL
DetailsJenny Nelson
Routing - MECHANICAL  11/14/2018 PASS
DetailsTroy James
Plan resubmittals received  11/13/2018 DONE
Resubmittals recieved 3 sets of sheet C1-took to Jenny
Routing PW Grading-Hillside10/25/2018 11/8/2018 FAIL
DetailsMelissa Jannusch
Trench drain and exisiting grade lines
Route to Impact Fee Review10/24/201810/27/201810/25/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing10/24/2018 10/25/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  10/24/2018 DONE
Intake Approval  10/24/2018 PASS
Recd Pcfee & Taken To Pln CK  10/24/2018 DONE
PubWorks Subgrade Approval11/12/201911/12/2019  DONE
*Retaining wall footing* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Application received 10/24/2018   
Routing - PLANNING12/26/2018   FAIL
Setbacks are on the plat as 20 feet. They apply to all floors not just the first floor.
Routing - PUBLIC WORKS    FAIL
SEE HILLSIDE FOR FAIL
Routing - PLANNING11/8/2018   FAIL
Building in front yard easement
Routing - PLANNING1/8/2019   FAIL
V3: No changes were made to the building in the easement 1/8/19