BLD-Final | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####
|
FIRE-Final Inspection | 5/28/2019 | 5/29/2019 | 5/29/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Brian Phone #: ###-####
|
Permanent Occupancy | | | 5/29/2019 | | DONE |
|
|
|
|
FIRE-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | P | CANC |
Troy Cobbley
|
|
|
Waiting for Johnson Controls to schedule and provide drawings for the two FIR permits that can be found under the "parcel search". Brian Phone #: ###-####
|
FIRE-Final Inspection | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | CANC |
Troy Cobbley
|
|
|
Will be rescheduled when both FIR permits have been inspected/approved. Brian Phone #: ###-####
|
BLD-Final | 11/5/2018 | 11/6/2018 | 11/6/2018 | A | CANC |
Jim Storey
|
|
|
Bryan Phone #: ###-####
|
FIRE-Final Inspection | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | FAIL |
Troy Cobbley
|
|
|
Repair the existing fire alarm panel, provide annual inspection for the fire extinguishers and the existing fire sprinkler system, provide sprinkler modifications for the printing area on the first floor Lobby area.
Bryan Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2018 | | DONE |
Michael Hanson
|
|
|
|
Print Occupancy Form | | | 11/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
met
|
Telephone call | | | 11/5/2018 | | DONE |
|
|
|
Spoke with Brain to inform him the permit is ready to be picked up.
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 10/24/2018 | | 11/5/2018 | | DONE |
Michael Hanson
|
|
|
10/30 #528 L2 Paper. 1st review completed - Pending email from applicant regarding high pile storage. MDH
|
Case Summary (BLD) | | | 11/2/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - FIRE | 10/30/2018 | 10/30/2018 | 11/1/2018 | | PASS |
Erika Akin
|
|
|
No work to be done under this permit. No change of use or occupancy. Fire extinguishers will be required on each level within a 75 foot travel distance of any location. No comments attached.
|
1st review completed | | | 10/30/2018 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 10/24/2018 | | 10/30/2018 | | PASS |
Michael Hanson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/24/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2018 | | DONE |
|
|
|
|
First Notice | | 6/8/2019 | | | |
|
|
|
|
Application received | | 10/24/2018 | | | |
|
|
|
|