BLD-Final | 12/18/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 10/25/2018 | 10/29/2018 | 10/29/2018 | A | FAIL |
Brandon Shaw
|
|
|
Provide verification of column footings, i.e., pictures or dig and expose footing on at least one footing... Gas appliance to be installed and vented per manufactures recommendations... Chimney to be built per Ch. 10 of the IRC...
|
Routing Walk-In (Zoning) | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/25/2018 | 10/25/2018 | 10/25/2018 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/25/2018 | | 10/25/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/25/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/25/2018 | | DONE |
|
|
|
|
Application received | | 10/25/2018 | | | |
|
|
|
|