Permit Information
Permit NumberBLD18-03929
StatusFinaled
Name IMPERIAL PLAZA HOA
Site Address 200 N 3RD ST
Project NameImperial Plaza Condominiums
Customer Number 
ePlanReviewYes
Description
(IMPERIAL PLAZA CONDOMINIUMS – 1st FLOOR LOBBY – UNIT C2-A) Permit is to remodel the existing 1st floor interior storefront area. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior business storefront window and door and replace with new storefront window and door, removal of select interior nonbearing wall and interior finishes in compliance with Ch. 8 of the 2015 IBC. The entire basement of this existing high-rise building is required to have a fire sprinkler system. The rest of the building does not have fire sprinklers. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/18/201812/18/201812/20/2018PPASS
DetailsDave Hannah
call 10 mins ahead- Christy Phone #: ###-####
DOC - Permit Finaled  12/20/2018 DONE
Per finaled BLD final
Letter of compliance/Occupancy  12/20/2018 DONE
FIRE-Final Inspection12/18/201812/18/201812/18/2018PPASS
DetailsJim Page
Final life fire safety inspection for scope of work complete.

call 10 mins ahead- Christy Phone #: ###-####
Inspection Record Card- Bld  11/8/2018 DONE
Issue PAID IN FULL permit  11/8/2018 DONE
(F) Reprint permit  11/8/2018 DONE
Plan assigned to (JG)11/5/201811/5/201811/6/2018 PASS
DetailsJavier Guzman
11/07 L1 Unit C2-A Interior Storefront ePlan***
Routing - PLAN CHECK11/5/2018 11/6/2018 PASS
DetailsJavier Guzman
1st review completed  11/6/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/6/2018 DONE
Permit Ready to Issue  11/6/2018 DONE
NEED
GC
Rev cert of val
Intake Approval  11/1/2018 PASS
DetailsJavier Guzman
Intake Approval  10/30/2018 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Provide the owners signature on the uploaded #304 form
Application received  10/25/2018 DONE
Application submitted via PDS Online on Oct 25 2018 4:33PM