BLD-Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Jim Sly
|
|
|
Alex Phone #: ###-####
|
DOC - Permit Finaled | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 4/8/2019 | 4/10/2019 | 4/10/2019 | A | FAIL |
Jim Sly
|
|
|
Alex Phone #: ###-#### C/N posted. 2 areas of drainage at East side of house. Draining on neighbors property. Need Blower door test results.
|
BLD-Energy code compliance | 1/30/2019 | 1/31/2019 | 1/30/2019 | A | PASS |
Jim Sly
|
|
|
Alex Phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | PASS |
Jim Sly
|
|
|
Alex Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | NR |
Jim Sly
|
|
|
Alex Phone #: ###-#### Need all trade R/I approvals prior to calling frame insp.
|
BLD-Wall Bracing | 1/9/2019 | 1/10/2019 | 1/10/2019 | A | PASS |
Jim Sly
|
|
|
Alex Phone #: ###-####
|
BLD-Wall Bracing | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PART |
Jim Sly
|
|
|
Isauro Phone #: ###-#### or ###-#### Alex All OK to cover except garage front..
|
BLD-Foundation | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | PASS |
Jim Sly
|
|
|
Joel Phone #: ###-####
|
BLD-Footing | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Dave Hannah
|
|
|
Joel Phone #: ###-####
|
Inspection Record Card- Bld | | | 11/21/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/21/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/20/2018 | | DONE |
|
|
|
Left message for Alex to inform him we still need the RP before we can issue the permits.
|
OVERRIDE | | | 11/16/2018 | | |
|
|
|
|
Telephone call | | | 11/16/2018 | | DONE |
|
|
|
emailed, empireconstructionllc@gmail.com, stating an rp is needed before issuance
|
Routing - PLAN CHECK | 11/14/2018 | | 11/16/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 11/16/2018 | | DONE |
|
|
|
Need
RP
|
Plan assigned to (M_H) | 11/1/2018 | | 11/16/2018 | | DONE |
Michael Hanson
|
|
|
11/14 #402 L1 ePlan. 1st review completed - See changemarks in ePlan for corrections required. MDH
|
Routing - PLAN CHECK | 11/1/2018 | | 11/14/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
1st review completed | | | 11/14/2018 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required. MDH
|
Routing - MECHANICAL | 11/1/2018 | | 11/6/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/1/2018 | 11/4/2018 | 11/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - Addressing | 11/1/2018 | | 11/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/1/2018 | | 11/2/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/1/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 11/1/2018 | | 11/1/2018 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 10/29/2018 | | FAIL |
|
|
|
Need Manual J, stair details (risers, treads & handrail) and drawings/plans need to be uploaded into drawings folder.
|
Application received | | | 10/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 26 2018 9:28AM
|