Permit Information
Permit NumberBLD18-03934
StatusFinaled
Name STERLING CONSTRUCTION
Site Address 2703 S SIMSBURY PL
Project NameBurch remodel
Customer Number 
ePlanReviewNo
Description
MODIFICATION - CONVERTING 1,500SQ' OF EXISTING BASEMENT TO LIVING SPACE THAT INCLUDES 2bd/1bth 5-6-19 **jab** MODFICATION TO CHANGE FOUR WINDOWS IN AN EXISTING BASEMENT **jab** Permit for a remodel, to include: Construct new 23'x32' garage with p.e. roof trusses one window and new dwelling to garage fire door. - All work per plans, notations, attachments, local codes & ordinances. Separate electrical permits required. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20196/10/20196/10/2019PPASS
DetailsMike Jordan
Please call before you come. Phone #: ###-#### Inspection requested via web by Steven Burch
DOC - Permit Finaled6/10/20196/10/20196/10/2019PPASS
DetailsMike Jordan
BLD-Energy code compliance5/10/20195/10/20195/10/2019PPASS
DetailsBrandon Shaw
Please call before coming.###-####. Phone #: ###-#### Inspection requested via web by Steven Burch
BLD-Energy code compliance5/7/20195/8/20195/8/2019PPASS
DetailsMike Jordan
for garage // Steve Phone #: ###-####
BLD-Framing/Rough-in5/7/20195/8/20195/8/2019PPASS
DetailsMike Jordan
Steve Phone #: ###-####. Framing in basement ok.
Routing Walk-In (BLD)5/6/20195/6/20195/6/2019ADONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh5/6/20195/6/20195/6/2019 PASS
DetailsJosh Bogle
Routing - PLAN CHECK5/6/2019 5/6/2019 PASS
DetailsJosh Bogle
Case Summary (BLD)  5/6/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  5/6/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  5/6/2019 DONE
came in for a plan mod on finishing up the basement
CHANGE STATUS TO (ISS)  5/6/2019 DONE
Plan Modification Accepted  5/6/2019 DONE
Finishing the basement.
Routing - MECHANICAL3/13/2019 3/13/2019 PASS
DetailsTroy James
Manual j report
BLD-Framing/Rough-in1/22/20191/22/20191/22/2019PPART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Steven Burch
Need Electr R/I
BLD-Wall Bracing1/22/20191/22/20191/22/2019PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Steven Burch
BLD-Other1/22/20191/22/20191/22/2019PNR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Steven Burch
BLD-Framing/Rough-in1/21/20191/22/20191/22/2019AFAIL
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Steven Burch
Add lateral truss bracing at 2 foot OC....top chord trusses not sheathed.
BLD-Wall Bracing1/21/20191/22/20191/22/2019ANR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Steven Burch
Add straps at Garage for Portal.
Routing Walk-In (Zoning)1/18/20191/18/20191/18/2019APASS
DetailsKarla Nelson
Routing Walk-In (BLD)1/18/20191/18/20191/18/2019ADONE
DetailsJosh Bogle
Application received 10/26/20181/18/2019 PASS
Routing - PLAN CHECK1/18/2019 1/18/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  1/18/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  1/18/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  1/18/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  1/18/2019 DONE
plan mod approved
CHANGE STATUS TO (ISS)  1/18/2019 DONE
CHANGE STATUS TO (REV)  1/18/2019 DONE
sent to P&Z for plan review on plan mod-then to JAB
Plan Modification Accepted  1/18/2019 DONE
Plan mod came in as a walk in-adding 4 egress windows-sent to P & Z for plan review- then JAB will look at it
BLD-Foundation11/5/201811/5/201811/5/2018PPART
DetailsMike Jordan
No hurry. Phone #: ###-#### Inspection requested via web by Steven Burch
BLD-Footing10/29/201810/29/201810/29/2018PPART
DetailsMike Jordan
Not a big hurry. Phone #: ###-#### Inspection requested via web by Steven Burch
Routing Walk-In (Zoning)10/26/201810/26/201810/26/2018APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)10/26/201810/26/201810/26/2018APASS
DetailsMichael Hanson
1st review completed  10/26/2018 DONE
DetailsMichael Hanson
Routing - PLAN CHECK10/26/2018 10/26/2018 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  10/26/2018 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  10/26/2018 DONE
DetailsMichael Hanson
Case Summary (BLD)  10/26/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  10/26/2018 DONE
Issue PAID IN FULL permit  10/26/2018 DONE