PubWorks Subgrade Approval | 3/14/2019 | 3/14/2019 | 3/14/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | PASS |
Brandon Shaw
|
|
|
Rebar and ground clearance good, OK to pour...
|
PubWorks Subgrade Approval | 11/8/2018 | 11/8/2018 | 11/8/2018 | | DONE |
Melissa Jannusch
|
|
|
POOL AND RETAINING WALL. A letter from the applicant’s geotechnical engineer indicating that the POOL/RETAINING WALL subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Other | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | NR |
Brandon Shaw
|
|
|
Need Geo soils subgrade submitted and approved by P.W.
|
Issue PAID IN FULL permit | | | 10/31/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 10/30/2018 | | |
|
|
|
|
Telephone call | | | 10/30/2018 | | DONE |
|
|
|
Spoke with James to inform him the permit is ready, what fees are due and that we need him to fill out a 302 form.
|
Routing - Erosion and Sediment | 10/30/2018 | | 10/30/2018 | | PASS |
Andy J. Long
|
|
|
ESCP waiver request approved. Certified RP listed. Site preparation inspection required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/30/2018 | | DONE |
|
|
|
Need
GC Form
|
Plan assigned to (M_H) | 10/26/2018 | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 10/26/2018 | 10/26/2018 | 10/29/2018 | P | PASS |
Josh Bogle
|
|
|
taken in as a level 2
|
Plan Reviewer's activity | | | 10/26/2018 | | DONE |
Brian McGowan
|
|
|
Took plans to Public Works
|
Routing PW Grading-Hillside | 10/26/2018 | | 10/26/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 10/26/2018 | | 10/26/2018 | | PASS |
Morgan Webb
|
|
|
|
1st review completed | | | 10/26/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | | | 10/26/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 10/26/2018 | | 10/26/2018 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/26/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/26/2018 | | DONE |
|
|
|
|
Application received | | 10/26/2018 | | | |
|
|
|
|