Letter of compliance/Occupancy | | | 3/27/2020 | | DONE |
|
|
|
|
BLD-Final | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Mike Jordan
|
|
|
energy cert notice posted on breaker box door.
handrails have been raised Phone #: ###-#### Inspection requested via web by Stephen Griswold. All issues were resolved.
|
BLD-Blower Door Test Results | 3/20/2020 | 3/20/2020 | 3/20/2020 | P | DONE |
Mike Jordan
|
|
|
4.3
|
BLD-Final | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Stephen Griswold. Exterior handrail to main entry mounted to low. provide blower door test results and report as well as the required energy cert and post. Correction notice posted.
|
PubWorks Occupancy Approval | 3/18/2020 | 3/18/2020 | 3/18/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 1/21/2020 | 1/21/2020 | 1/22/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 1/17/2020 | 1/17/2020 | 1/17/2020 | P | NR |
Tony Young
|
|
|
Please call with an estimated ETA for inspection, I''d like to be there. Phone #: ###-#### Inspection requested via web by Stephen Griswold// needs hillside,, trades,, hand rails per code,, blower door test,, fire caulking,, address, etc
|
BLD-Framing/Rough-in | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Jim Storey
|
|
|
Please call 30 minutes before arrival. We would like to meet with inspector on site. Phone #: ###-#### Inspection requested via web by Stephen Griswold
|
BLD-Energy code compliance | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Jim Storey
|
|
|
Please call 30 minutes before arrival. We would like to meet with inspector on site. Phone #: ###-#### Inspection requested via web by Stephen Griswold
|
BLD-Framing/Rough-in | 8/28/2019 | 8/28/2019 | 8/28/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephen Griswold,, see painted corrections,, seal plates, need truss engineering, strap plates, etc,, ok to insulate
|
Routing - MECHANICAL | 8/13/2019 | | 8/13/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Foundation | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrew Clark
|
BLD-Footing | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PART |
Tony Young
|
|
|
Andrew- wall footing Phone #: ###-####,, footings already done,, foundation wall ok
|
BLD-Footing | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Conference | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PART |
Tony Young
|
|
|
Andrew Phone #: ###-####,, foundation ?s,, needs to be 24" frost protection,, can use existing retaining wall footing to support the first couple of floor joists with proper sill and attachment
|
BLD-Footing | 4/30/2019 | 5/2/2019 | 5/2/2019 | P | CANC |
Tony Young
|
|
|
Jared Phone #: ###-#### cancel per jared
|
PubWorks Subgrade Approval | 4/30/2019 | 4/30/2019 | 4/30/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 4/12/2019 | | DONE |
|
|
|
emailed andrewc@brightstarps.com to signed permit and send back
|
Inspection Record Card- Bld | | | 4/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/12/2019 | | DONE |
|
|
|
|
Expiration Notice | 4/5/2019 | 4/26/2019 | 4/5/2019 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 4/4/2019 | | DONE |
|
|
|
emailed andrewc@brightstarps.com that all the fees were not paid and once they pay them to let us know so we can have them sign the permits
|
OVERRIDE | | | 3/29/2019 | | |
|
|
|
|
Plan assigned to (M_H) | 1/29/2019 | | 3/29/2019 | | DONE |
Michael Hanson
|
|
|
3rd review completed 02/15 #404 L2 ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/29/2019 | | DONE |
|
|
|
Need to make sure the fees are correct for PRK's-called Karina and left message that there was a demo in 2007
MET-RP (current one is expired)
|
Routing PW Grading-Hillside | 3/28/2019 | | 3/28/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 3/11/2019 | | 3/26/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Grading-Hillside | 3/14/2019 | | 3/20/2019 | | FAIL |
Melissa Jannusch
|
|
|
Please update geotechnical site suitablity letter with most recent grading and drainage plans per changemark 2-6 and 2-22 -PW Hillside MMJ
|
Routing Off Site - STRUCTURAL | 3/11/2019 | | 3/14/2019 | | PASS |
Michael Hanson
|
|
|
Per Jan @ Stapley.
|
Routing - PLANNING | 3/11/2019 | | 3/11/2019 | | PASS |
Nicolette Womack
|
|
|
Front steps railings approved as per revised elevations 3-11-19.
|
Routing PW Grading-Hillside | 3/8/2019 | | 3/8/2019 | | FAIL |
Melissa Jannusch
|
|
|
FAIL per M_H due to new plans
|
Routing Off Site - STRUCTURAL | 2/22/2019 | | 3/8/2019 | | FAIL |
Michael Hanson
|
|
|
Per Jan W. @ Stapley.
|
Routing - PLANNING | 3/6/2019 | | 3/6/2019 | | FAIL |
Nicolette Womack
|
|
|
Retaining Wall and Railing combined height cannot exceed 3' from finished grade within the front yard setback.
|
Routing - PLAN CHECK | 2/22/2019 | | 3/6/2019 | | FAIL |
Michael Hanson
|
|
|
See ePlan for corrections required.
|
Routing - PLANNING | 2/12/2019 | | 2/25/2019 | | FAIL |
Nicolette Womack
|
|
|
Driveway shall not exceed 33' in width within the front yard setback.
|
Routing PW Grading-Hillside | 2/12/2019 | | 2/22/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing Off Site - STRUCTURAL | 2/12/2019 | | 2/22/2019 | | FAIL |
Michael Hanson
|
|
|
All changemarks have not been resolved.
|
Routing - PLAN CHECK | 2/11/2019 | | 2/22/2019 | | FAIL |
Michael Hanson
|
|
|
All changemarks have not been resolved.
|
Routing - FIRE | 2/20/2019 | 2/12/2019 | 2/21/2019 | | FAIL |
Lee G Meredith
|
|
|
03/04 Collister house hillside construction-residential.
Available hydrant fire flow is inadequate. Sprinklers required.
|
Routing Off Site - STRUCTURAL | 2/7/2019 | | 2/12/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
1st review completed | | | 2/12/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 1/29/2019 | | 2/11/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan for corrections required.
|
Routing PW Grading-Hillside | 1/29/2019 | | 2/6/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - FIRE | 1/29/2019 | 1/29/2019 | 2/5/2019 | | PASS |
Lee G Meredith
|
|
|
New SFH
SUEZ letter indicating available fire flow not provided.Emailed review comments to applicant.
3-6-19 SUEZ fire flow letter received and indicates adequate GPM is available.
|
Routing - MECHANICAL | 2/4/2019 | | 2/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/29/2019 | | 1/31/2019 | | FAIL |
Nicolette Womack
|
|
|
Driveways shall not exceed 33' in width within the front yard setback.
|
Route to Impact Fee Review | 1/29/2019 | 2/1/2019 | 1/30/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/29/2019 | | 1/30/2019 | | FAIL |
Troy James
|
|
|
Need manual j report
|
Routing - Addressing | 1/29/2019 | | 1/29/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 1/29/2019 | | 1/29/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 1/29/2019 | | 1/29/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Intake Approval | | | 1/29/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/29/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/29/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/28/2019 | | FAIL |
|
|
|
NEED
2nd floor framing
show location of attic and crawl space access
|
Intake Approval | | | 12/28/2018 | | FAIL |
|
|
|
1. Foundation needs to be stamped. 2. Crawlspace vents or conditional crawl. 3. Attic access. 4. Second floor framing. 5. Elevations - total height. 6. Stair section details.
|
Application received | | | 10/30/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 30 2018 3:04PM
|