Permit Information
Permit NumberBLD18-03973
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2406 S TRAPPER PL
Project NameHighland Manor HN 30-1
Customer Number 
ePlanReviewYes
Description
PLAN MOD for 2-3 ft retaining wall***Prescriptive component energy approach*** WUI Zone A requirements*** Permit for the construction of a new 3674 sq. ft., two story (first story 1971 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 272 sq. ft. of covered patio/porch and a 993 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. MDH
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20197/16/20197/16/2019APASS
DetailsBrandon Shaw
Less Phone #: ###-####
DOC - Permit Finaled7/16/20197/16/20197/16/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/16/20197/16/20197/16/2019ADONE
DetailsBrandon Shaw
ACH50- 3.92
PubWorks Occupancy Approval7/16/20197/16/20197/16/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
CHANGE STATUS TO (ISS)  7/15/2019 DONE
OVERRIDE  6/19/2019  
Permit Ready to Issue  6/19/2019 DONE
plan mod please do not re issue-per M_H no plan mod fee for them
Plan assigned to (M_H)6/12/2019 6/19/2019 DONE
DetailsMichael Hanson
06/14 plan mod ePlan - Retaining wall
Routing - PLANNING6/18/2019 6/18/2019 PASS
DetailsSue Cummings
Still good from yesterday
Routing PW Grading-Hillside6/10/2019 6/14/2019 PASS
DetailsMelissa Jannusch
Plan mod approved


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PLAN CHECK6/10/2019 6/12/2019 PASS
DetailsMichael Hanson
Modifications to the retaining wall do not effect the structure.
Routing - PLANNING6/10/2019 6/10/2019 FAIL
DetailsSue Cummings
Site plan shows existing retaining wall. I need to know where the new one will be
Plan Modification Accepted  6/10/2019 DONE
Per Kyle, need to start plan modification for new grading plan.
BLD-Other2/25/20192/25/20192/25/2019PPASS
DetailsBrandon Shaw
sofit // Les Phone #: ###-####
BLD-Energy code compliance2/20/20192/21/20192/21/2019APASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in2/19/20192/19/20192/19/2019PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
OVERRIDE  2/15/2019  
CHANGE STATUS TO (ISS)  2/15/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/15/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  2/15/2019 DONE
plan mod - DO NOT REISSUE
Plan assigned to (M_H)2/12/2019 2/15/2019 DONE
DetailsMichael Hanson
02/18 plan mod L2 ePlan
Routing - PLAN CHECK2/12/2019 2/15/2019 PASS
DetailsMichael Hanson
No review required. Plan mod is for retaining wall only. Coordinated with MMJ.
Routing PW Grading-Hillside2/13/2019 2/14/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

Routing - PUBLIC WORKS2/12/2019 2/13/2019 PASS
DetailsMorgan Webb
Plan Modification Accepted  2/12/2019 DONE
revise the grading and drainage plan and put a retaining wall
BLD-Wall Bracing2/1/20192/4/20192/4/2019APART
DetailsBrandon Shaw
First floor only...
Work in progress...
BLD-Foundation12/26/201812/26/201812/26/2018PPASS
DetailsDave Hannah
Edgar Phone #: ###-####
BLD-Footing12/18/201812/18/201812/18/2018PPASS
DetailsBrandon Shaw
work in progress
PubWorks Subgrade Approval12/18/201812/18/201812/18/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  11/29/2018 DONE
Inspection Record Card- Bld  11/29/2018 DONE
OVERRIDE  11/15/2018  
1st review completed  11/15/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  11/15/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  11/15/2018 DONE
Plan assigned to (M_H)10/31/2018 11/15/2018 DONE
DetailsMichael Hanson
11/19 #402 L2 ePlan
Routing - PLAN CHECK10/31/2018 11/15/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside10/31/2018 11/8/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Route to Impact Fee Review10/31/201811/3/201811/2/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment10/31/2018 11/2/2018 PASS
DetailsMichael Zawacki
Foothills home, site prep inspection required.
Routing - FIRE11/1/201811/1/201811/1/2018 PASS
DetailsLee G Meredith
Routing - MECHANICAL10/31/2018 10/31/2018 PASS
DetailsTroy James
Routing - PLANNING10/31/2018 10/31/2018 PASS
DetailsSue Cummings
Routing - Addressing10/31/2018 10/31/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/31/2018 10/31/2018 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/31/2018 DONE
Recd Pcfee & Taken To Pln CK  10/31/2018 DONE
Intake Approval  10/31/2018 PASS
Application received  10/30/2018 DONE
Application submitted via PDS Online on Oct 30 2018 4:12PM
Intake Approval  10/30/2018 FAIL
Missing Soils and Geotechnical Report, stamped and signed by an Idaho licensed design professional