BLD-Final | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 2.97
|
BLD-Energy code compliance | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Brandon Shaw
|
|
|
scott Phone #: ###-####
|
BLD-Wall cover | 8/15/2019 | 8/16/2019 | 8/16/2019 | A | NR |
Brandon Shaw
|
|
|
Framing rough-in need air/foam seal...
|
BLD-Wall Bracing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Footing | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | PART |
Dave Hannah
|
|
|
Pat Phone #: ###-#### setback ok forms in rebar at80% ok
|
Routing PW Grading-Hillside | 5/3/2019 | | 5/3/2019 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
Issue PAID IN FULL permit | | | 3/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/23/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 10/30/2018 | 10/30/2018 | 11/23/2018 | | DONE |
Brian McGowan
|
|
|
11/12 sfd L1 paper- must pass Fire
|
Case Summary (BLD) | | | 11/23/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2018 | | DONE |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 11/23/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 11/23/2018 | | DONE |
|
|
|
MET
need RP
|
Inspection Record Card- Bld | | | 11/23/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/23/2018 | | DONE |
|
|
|
left message that permit is ready, fee amount due and need to know who the RP will be
|
Plan Reviewer's activity | | | 11/20/2018 | | DONE |
|
|
|
Emailed Mike Falash a copy of the fire code review comments and explained that the sq. footage of the fire area exceeded the maximum allowed by IFC requirements. Informed him that the options were to increase fire flow, reduce fire area or provide a fire sprinkler system. If sprinkelrs are to be provided, it needs to be noted on the drawing set cover sheet.
|
1st review completed | | | 11/13/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | | | 11/13/2018 | | PASS |
Brian McGowan
|
|
|
Still need specification sheet on membrane roofing.
|
Routing - FIRE | 11/1/2018 | | 11/9/2018 | | PASS |
Erika Akin
|
|
|
New SFH Paper Lee's cube
Revised fire area eliminates the need for automatic sprinklers.
11-21-18. Returned to Brian
|
Routing - MECHANICAL | | | 11/1/2018 | | PASS |
|
|
|
|
Route to Impact Fee Review | 10/30/2018 | 11/2/2018 | 10/31/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 10/31/2018 | | 10/31/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 10/30/2018 | | 10/31/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2018 | | 10/31/2018 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 10/30/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/30/2018 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/30/2018 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/30/2018 | | DONE |
|
|
|
|
Application received | | 10/30/2018 | | | |
|
|
|
|