BLD-Final | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Jim Storey
|
|
|
Please call when on your way. I will meet you there. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
DOC - Permit Finaled | 3/12/2019 | 3/12/2019 | 3/12/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Jim Storey
|
|
|
Plans in conduit tube by back door. Enter through back door form north sideyard. Please include energy code inspection. Mainly inspecting original house to beam tie in and stairs. Please call with questions. Thanks. Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Dave Hannah
|
|
|
Walk around north side of building to rear of structure and addition is there. we have not taken out existing house wall yet. we would like to insulate and install ceiling drywall before we break into existing building. We will do another structural inspection when we are complete with tie in of old building. Please call with questions. thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
BLD-Footing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
OVERRIDE | | | 11/5/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/5/2018 | | 11/5/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Jeff Lowe
|
|
|
existing kitchen being demo'd and moved. one kitchen only.
|
Routing Walk-In (BLD) | 10/31/2018 | 10/31/2018 | 10/31/2018 | A | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 10/31/2018 | | FAIL |
Brian McGowan
|
|
|
Need more information on Basement walls.
|
Routing - PLAN CHECK | 10/31/2018 | | 10/31/2018 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 10/31/2018 | | | |
|
|
|
|