BLD-Final | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | NR |
Mike Jordan
|
|
|
David Simpson is onsite superintendent Phone #: ###-#### Inspection requested via web by Tiffanny Goodman. Needs electrical final.
|
FIRE-Final Inspection | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Mark Scharfen
|
|
|
Conducted fire life safety inspection. Passed.
David Simpson onsite superintendent Phone #: ###-#### >> Inspection requested via web by Tiffanny Goodman
|
CHANGE STATUS TO (ISS) | | | 2/6/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/24/2019 | 1/24/2019 | 2/5/2019 | | PASS |
Javier Guzman
|
|
|
Plan mod, Walmart - Photo Lab, pend fire
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
plan mod
|
Routing - FIRE | 1/25/2019 | 1/25/2019 | 1/31/2019 | | PASS |
Erika Akin
|
|
|
No changes to previous comments
|
Routing - PLAN CHECK | 1/25/2019 | | 1/28/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 1/25/2019 | | 1/28/2019 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 1/24/2019 | | DONE |
|
|
|
Plan mod accepted e plan-revised sheet name on A1, add sheet A1.1, add apparel changes to SOW. Remove existing fitting rooms, install new fitting rooms. Add power to fitting rooms . Add P1 sheet to show demoed PL sink and eyewash. Shheets C1, A1, A1.1, P1, E1, E2 & FXS1-assigned to JG
|
Issue PAID IN FULL permit | | | 1/14/2019 | | DONE |
|
|
|
emailed marie.vermillion@pb2ae.com to sign building permit-GC didn't have an email in system
|
Inspection Record Card- Bld | | | 1/14/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/11/2018 | 12/11/2018 | 1/8/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 12/14 L1 Walmart #2508 ePlan
|
Routing - PLAN CHECK | 1/8/2019 | | 1/8/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/8/2019 | | DONE |
|
|
|
MET
Need
GC Form
Revised Value
|
Route to Impact Fee Review | 12/18/2018 | 12/21/2018 | 12/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 12/18/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/11/2018 | | 12/18/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 12/12/2018 | 12/12/2018 | 12/13/2018 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. A permit will be required for any necessary modifications.
|
Routing - Addressing | 12/11/2018 | | 12/12/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/11/2018 | | 12/11/2018 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 12/10/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/4/2018 | | FAIL |
Brian McGowan
|
|
|
Form #310 must be completed; all fields must be filled in as required. The type of inspections must be chosen. The specification documents submitted specify that Special Inspections are required. The form must be signed and stamped by the Engineer.
|
Intake Approval | | | 11/26/2018 | | FAIL |
Brian McGowan
|
|
|
Form #310 must be completed; all fields must be filled in as required.
|
Intake Approval | | | 11/7/2018 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information for the Prescreen to be approved.
1. Provide a completed Form #304, Registered Design Professional.
2.Provide the ICC-ESR Reports as required by the Engineering. Special Inspections are required, provide a completed #310 Form.
3. Provide the Engineering calculations.
|
Intake Approval | | | 11/1/2018 | | FAIL |
Brian McGowan
|
|
|
Please upload the Checklist and provide the necessary drawings and documents as required by the checklist.
|
Application received | | | 10/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2018 1:47PM
|