Permit Information
Permit NumberBLD18-03986
StatusFinaled
Name RIVERBROOK HOMES INC
Site Address 8730 W POCONO LN
Project NameColson Place Carports
Customer Number 
ePlanReviewNo
Description
(COLSON PLACE CARPORTS – 54 COVERED PARKING SPACES) (DRH17-00039) (CAR16-00032) (SUB16-00057) The carports will not have a fire sprinkler system. To construct 9 carports to serve existing dwelling units. There will be two 18’ x 90’ carports (1,620 square feet each), one 18’ x 81’ carport (1,458 square feet), one 18’ x 63’ carport (1,134 square feet), one 18’ x 45’ carport (810 square feet), three 18’ x 36’ carports (648 square feet each), and one 18’ x 27’ carport (486 square feet). The total floor area of all carports will be about 9,072 square feet. Three carports are considered to be one “building” having a floor area of 3,888 square feet (West), three carports are considered to be one “building” having a floor area of 2,268 square feet (Southeast), and three carports are considered to be one “building” having a floor area of 2,916 square feet (Northeast). Each carport “building” is required to be separated from other carport “buildings” by at least 10 feet and each carport “building” is required to be separated from property lines by at least 5 feet. Work is to include concrete footings, steel columns, steel beams, steel purlins, and metal roof decks. Special Inspection is required for any field welding. Accessible parking spaces, including the adjacent access aisle that serves it, are required to be covered. No columns are allowed to be located between the parking space and the adjacent access aisle of an accessible parking space. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  11/27/2019 DONE
Paper drawings taken to Records
Third Notice 3/16/20194/8/2019 DONE
mailed 4-11-19
Telephone call  3/19/2019 DONE
called Nate-final value came back in the mail so called to verify address. He gave me the correct Ste # and asked me to email it to him so i did
Second Notice 2/17/20193/11/2019 DONE
mailed 3-12
First Notice1/15/20191/15/20192/7/2019 DONE
DetailsBrandon Shaw
mailed 2-11-19
BLD-Final1/15/20191/15/20191/15/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Nate Mitchell
DOC - Permit Finaled1/15/20191/15/20191/15/2019PPASS
DetailsBrandon Shaw
BLD-Footing1/7/20191/8/20191/8/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Nate Mitchell
Print Occupancy Form  12/27/2018 DONE
Issue PAID IN FULL permit  12/27/2018 DONE
Plan assigned to (CJW)11/6/201811/6/201812/4/2018 PASS
DetailsCarl Westfall
(2nd done) 11/20/18 (New - 15 days) (paper) Colson Place Carports
PLANS/APPL TAKEN TO FRONT DESK  12/4/2018 DONE
Permit Ready to Issue  12/4/2018 DONE
MET
GC
ACHD
Rev cert of val
Print Occupancy Form  12/4/2018 DONE
Telephone call  12/4/2018 DONE
left a message for steve informing him this permit is ready and what is needed before issuance
Routing - Design Review12/3/2018 12/3/2018 PASS
DetailsJosh Wilson
Routing - PLANNING12/3/2018 12/3/2018 PASS
DetailsCody Riddle
Ok per CER
Routing Off Site - STRUCTURAL11/27/2018 11/28/2018 PASS
DetailsCarl Westfall
Forwarded Email response on to Cory Harelson (KPFF) for his 2nd review.
Route to Impact Fee Review11/27/201811/30/201811/27/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  11/27/2018 DONE
Response for Structural. Nothing for Planning or Design Review.
Routing - PLAN CHECK11/27/2018 11/27/2018 PASS
DetailsCarl Westfall
Pending approval by Structural
Routing - FIRE11/19/201811/19/201811/20/2018 PASS
DetailsErika Akin
Carports to be installed over parking spaces. No impact to existing FD access roadway. No comments attached. PDS/Fire Inspector to field verify.
1st review completed  11/20/2018 DONE
Plan resubmittals requested  11/19/2018 DONE
Routing Off Site - STRUCTURAL11/6/2018 11/19/2018 FAIL
DetailsCarl Westfall
Cory Harelson (KPFF) - Emailed the report to the applicant Scott Noriyuki.
Routing - Erosion and Sediment11/6/2018 11/13/2018 PASS
DetailsAndy J. Long
No new ESC permit needed. See Colson Place main site ESC permit ESC17-00111. Units on Pocono also have ESC permits already active.
Routing - Design Review11/6/2018 11/9/2018 FAIL
DetailsJosh Wilson
Carports not included in Design Review approval.
Routing - PLANNING11/6/2018 11/8/2018 FAIL
DetailsCody Riddle
No scaled site plan provided.
Routing - PUBLIC WORKS11/6/2018 11/8/2018 PASS
DetailsAngela Hardy
Routing PW Street Lights11/7/2018 11/8/2018 PASS
DetailsTom Marshall
Routing PW Drainage11/7/2018 11/7/2018 PASS
DetailsBrian Murphy
Routing - Addressing11/6/2018 11/7/2018 PASS
DetailsDoug Chausow
Intake Approval  10/31/2018  
Plan Reviewer's activity  10/25/2018 DONE
Since the required items had not yet been submitted, an Email was sent to the applicant reiterating where the application was deficient.
Intake Approval  10/12/2018 FAIL
The plan intake review was completed on October 12, 2018 and a phone message was left for the applicant describing where the application was difficient.
Plan Reviewer's activity  10/11/2018 DONE
The application and supporting documentation was received in the mail on October 11, 2018.
Application received 10/31/2018