Second Notice | | 1/18/2019 | 2/7/2019 | | DONE |
|
|
|
mailed 2-11-19
|
First Notice | | 12/23/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
FIRE-Final Inspection | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jeff Phone #: ###-####
|
Permanent Occupancy | | | 12/13/2018 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign and provide sticker at the main exit. Provide fire extinguishers as discussed. Provide plans and small documents.
Jeff Phone #: ###-####
|
BLD-Final | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PASS |
Jim Storey
|
|
|
Jeffery Phone #: ###-#### final ok pending fire
|
BLD-Conference | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PART |
Dave Hannah
|
|
|
Working/occupying with out CO and permit. occ will pick up permit and schedule final inspection
|
Print Occupancy Form | | | 11/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2018 | | DONE |
|
|
|
|
Routing - FIRE | 11/14/2018 | 11/14/2018 | 11/19/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (JHB) | 11/14/2018 | 11/14/2018 | 11/19/2018 | | PASS |
Joe Bruce
|
|
|
11/19 L1 Knife River Lab ePlan
|
1st review completed | | | 11/19/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2018 | | DONE |
|
|
|
NEED
GC form- MET
verification on who is the GC-may need rev cert of val
|
Routing - PLAN CHECK | 11/14/2018 | | 11/16/2018 | | PASS |
Joe Bruce
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/14/2018 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 11/14/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 11/8/2018 | | FAIL |
Joe Bruce
|
|
|
1) Upload the completed #518-checklist in the documents folder. Items that do not pertain to your project can be checked "N/A." Upload this into the documents folder.
2) A dimension to show the ceiling height on the plans is required.
|
Intake Approval | | | 11/1/2018 | | FAIL |
Joe Bruce
|
|
|
1) Upload the completed #518-checklist in the documents folder. Items that do not pertain to your project can be checked "N/A."
2) Upload new building plans that meet the minimum requirements.. Page 2 of the checklist notes that plans must be drawn to scale on 18"x24" minimum sheet size. The scale could not be located and the sheet size is 8.5" x 5.7" and 7.3" x 15.5".
3) Building plans that have been created by another architect are subject to copyright laws. The vicinity map and floorplan drawing submitted appear to be copied from another design professional. Unless you have consent from this architect, this is a violation of copyright law. Resubmit with checklist items that you have created by tracing or utilizing the copyrighted drawings as reference.
4) Provide door hardware information. The knob style hardware does not comply with the building code.
5) Provide the wall finish information. Wall sheathing and finish could not be located.
6) Provide stair details. I see tread and riser height, but no information on the handrail and guard requirements.
7) Provide structural calculations, floor framing plans, guard rail engineering/design, wall bracing details, and lateral force design requirements. The structural work shall be stamped and signed by and Idaho licensed engineer.
8) Since an engineer is required for this work: provide Form #304 - Registered Design Professional form
|
Application received | | | 10/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2018 2:39PM
|