BLD-Concrete | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PEND |
Dave Hannah
|
|
|
Charlie Phone #: ###-#### ok with spec inspection
|
BLD-Foundation | 12/9/2019 | 12/9/2019 | 12/11/2019 | P | PASS |
Dave Hannah
|
|
|
Charle Phone #: ###-#### ok after spec inspection sign offs
|
BLD-Concrete | 10/10/2019 | 10/11/2019 | 10/11/2019 | A | CANC |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Other | 8/13/2019 | 8/13/2019 | 8/16/2019 | P | PASS |
Dave Hannah
|
|
|
slab on deck level G //Brian Phone #: ###-####
|
BLD-Foundation | 7/17/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Dave Hannah
|
|
|
Brian- foundation slab Phone #: ###-####
|
BLD-Concrete | 7/8/2019 | 7/8/2019 | 7/9/2019 | P | PASS |
Dave Hannah
|
|
|
slab // brian Phone #: ###-####
|
BLD-Concrete | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PEND |
Dave Hannah
|
|
|
rebar in columns - gridline P15 // Brian Phone #: ###-####
|
BLD-Other | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | DEFR |
Mike Jordan
|
|
|
Brian- inspection for inwall rebar PCLINE Phone #: ###-####. Pending special inspection.
|
BLD-Concrete | 6/20/2019 | 6/21/2019 | 6/24/2019 | A | PASS |
Dave Hannah
|
|
|
rebar- Rid thin P15-Brian Phone #: ###-####
|
BLD-Foundation | 6/24/2019 | 6/25/2019 | 6/24/2019 | A | CANC |
Dave Hannah
|
|
|
P D line- Brian Phone #: ###-####
|
BLD-Wall Bracing | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PART |
Brandon Shaw
|
|
|
Pending Special Inspection... rebar line PB
|
BLD-Foundation | 6/13/2019 | 6/14/2019 | 6/17/2019 | A | PASS |
Dave Hannah
|
|
|
PB line- Brian Phone #: ###-####
|
BLD-Foundation | 6/12/2019 | 6/13/2019 | 6/17/2019 | A | PASS |
Dave Hannah
|
|
|
rebar on gridline PA // Brian Phone #: ###-####
|
BLD-Other | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | PEND |
Dave Hannah
|
|
|
Brian-shear wall rebar-grid line PB Phone #: ###-#### ok after spec final signoffs for placement of concrete
|
BLD-Wall Bracing | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PEND |
Dave Hannah
|
|
|
shear (pc grid line) // Brian Phone #: ###-#### ok after spec inspection sign off
|
BLD-Foundation | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PEND |
Dave Hannah
|
|
|
Brian- red line P15 going north to south Phone #: ###-#### ok after spec inspection sign off
|
BLD-Wall Bracing | 5/31/2019 | 6/3/2019 | 6/4/2019 | A | PEND |
Dave Hannah
|
|
|
Brian Phone #: ###-#### ok after spec inspection sign off
|
BLD-Other | 5/28/2019 | 5/29/2019 | 6/4/2019 | A | PEND |
Dave Hannah
|
|
|
concrete wall // Brian Phone #: ###-#### ok after spec inspection sign off
|
BLD-Footing | 5/30/2019 | 5/31/2019 | 6/4/2019 | A | PEND |
Dave Hannah
|
|
|
Brian-on grid line P15 ON THE EAST NE SIDE Phone #: ###-#### ok after spec inspection sign off
|
BLD-Foundation | 5/29/2019 | 5/30/2019 | 5/30/2019 | A | PEND |
Dave Hannah
|
|
|
Brian- inspection on grid line PD Phone #: ###-#### ok after spec insp sign offs
|
BLD-Other | 5/23/2019 | 5/24/2019 | 5/30/2019 | A | PEND |
Dave Hannah
|
|
|
Brian- column inspection- gridline PA North Wall Phone #: ###-#### ok after spec insp sign offs
|
BLD-Concrete | 5/22/2019 | 5/22/2019 | 5/30/2019 | A | PEND |
Dave Hannah
|
|
|
Brian-column line PA in the garage Phone #: ###-#### ok after spec insp sign offs
|
Extend Permit 90/180 days | 5/22/2019 | 5/22/2019 | 5/22/2019 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Footing | 5/20/2019 | 5/21/2019 | 5/22/2019 | A | PASS |
Dave Hannah
|
|
|
spread footer // Brian Phone #: ###-####
|
BLD-Other | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PART |
Dave Hannah
|
|
|
Brian-column line PA in the garage Phone #: ###-####
|
BLD-Wall Bracing | 5/16/2019 | 5/17/2019 | 5/20/2019 | P | PEND |
Dave Hannah
|
|
|
wall cast in place, W side // Brian Phone #: ###-#### ok after spec inspection
|
BLD-Foundation | 5/15/2019 | 5/15/2019 | 5/16/2019 | P | DONE |
Dave Hannah
|
|
|
rebar on N wall // Brian Phone #: ###-####
|
BLD-Foundation | 5/9/2019 | 5/10/2019 | 5/15/2019 | A | PART |
Dave Hannah
|
|
|
NW wall // Brian Phone #: ###-####
|
BLD-Foundation | 5/10/2019 | 5/13/2019 | 5/15/2019 | A | PART |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Foundation | 5/14/2019 | 5/15/2019 | 5/15/2019 | A | PART |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 5/2/2019 | 5/3/2019 | 5/6/2019 | A | DONE |
Dave Hannah
|
|
|
west wall // Brian Phone #: ###-####
|
BLD-Framing/Rough-in | 5/3/2019 | 5/6/2019 | 5/6/2019 | A | NR |
Dave Hannah
|
|
|
Brian Phone #: ###-####
|
Inspection Record Card- Bld | | | 4/15/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/15/2019 | | DONE |
|
|
|
MET
Need
ACHD
|
Plan assigned to (CDM) | 11/9/2018 | 11/9/2018 | 3/14/2019 | | PASS |
Carl D Madsen
|
|
|
St. Lukes Downtown Parking Garage
|
Routing - PLAN CHECK | 3/14/2019 | | 3/14/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 3/14/2019 | | 3/14/2019 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2019 | | DONE |
|
|
|
|
Routing PW Sewer Design | 2/20/2019 | | 2/22/2019 | | PASS |
DeAnn Brown
|
|
|
Connection to wet-line sewer is required and shown the corresponding grading permit (GRD18-00088).
|
Routing Off Site - STRUCTURAL | 2/20/2019 | | 2/21/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/20/2019 | | 2/21/2019 | | PASS |
Carl D Madsen
|
|
|
Pending issuance of the shoring permit and recording of easements.
|
Routing - Design Review | 2/20/2019 | | 2/20/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing Off Site - STRUCTURAL | 1/22/2019 | | 2/20/2019 | | FAIL |
Carl D Madsen
|
|
|
KPFF
|
Routing - PLAN CHECK | 1/22/2019 | | 2/9/2019 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/9/2018 | | 2/9/2019 | | FAIL |
Carl D Madsen
|
|
|
CH2M
|
Routing PW Drainage | 1/30/2019 | | 1/30/2019 | | FAIL |
Brian Murphy
|
|
|
NEED ACHD APDX J 80% NEED GRD18-00088 OKED
|
Routing - Design Review | 1/22/2019 | | 1/25/2019 | | FAIL |
Josh Wilson
|
|
|
Sheet AS101b- seating area required on 2nd Street per CUP18-00022
|
Routing - PLANNING | 1/22/2019 | | 1/24/2019 | | PASS |
Cody Riddle
|
|
|
|
Routing - MECHANICAL | 1/22/2019 | | 1/23/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 12/20/2018 | 12/23/2018 | 12/28/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 11/9/2018 | 11/9/2018 | 12/19/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 12/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/9/2018 | | 12/14/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 11/9/2018 | | 11/21/2018 | | FAIL |
Josh Wilson
|
|
|
Sheet AS101b- seating area required on 2nd Street per CUP18-00022
|
Routing - MECHANICAL | 11/9/2018 | | 11/20/2018 | | FAIL |
Troy James
|
|
|
|
Routing - PLUMBING | 11/9/2018 | | 11/16/2018 | | PASS |
Dan Ediger
|
|
|
Per ISPC/Plans. See redline note for DC assembly
|
Routing PW Sewer Design | 11/9/2018 | | 11/16/2018 | | FAIL |
DeAnn Brown
|
|
|
Mechanical and plumbing plans are low quality and unreadable. Please resubmit.
|
Routing PW Solid Waste | 11/9/2018 | | 11/14/2018 | | PASS |
Evan Carpenter
|
|
|
No new solid waste containers are proposed for this site.
|
Routing - Erosion and Sediment | 11/9/2018 | | 11/14/2018 | | CANC |
Andy J. Long
|
|
|
ESC for project already reviewed & approved. Site ESC permit to be covered by ESC18-01167
|
Routing - PUBLIC WORKS | 11/9/2018 | | 11/13/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 11/9/2018 | | 11/13/2018 | | FAIL |
Cody Riddle
|
|
|
Corrections/additional information required to demonstrate compliance with conditions #5 and 6 from the CUP. Emailed applicant.
|
Routing - Addressing | 11/9/2018 | | 11/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Street Lights | 11/9/2018 | | 11/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 11/8/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 11/7/2018 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 11/2/2018 | | FAIL |
|
|
|
(11-2-18) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Application received | | | 10/31/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2018 3:50PM
|
BLD-Concrete | 10/3/2019 | 10/4/2019 | | A | |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
Routing PW Drainage | 11/9/2018 | | | | FAIL |
Brian Murphy
|
|
|
NEED ACHD AGGREMENT80%TSS TREATMENT APDX J ECT
|
Routing PW Sewer Design | 1/23/2019 | | | | FAIL |
|
|
|
Please submit sewer extension plans that are associated with the central plant and parking garage for review.
|