Information based on query as of Tuesday, August 27, 2024.
Permit Information
Permit NumberBLD18-03993
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 3160 W ELDER ST Unit: 101
Project NameLayton Boise - Suite #101
Customer Number 
ePlanReviewYes
Description
(LAYTON BOISE - SUITE #101) Permit is to remodel an existing 2,447 sq. ft. business space within an existing 13,524 sq. ft. building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of roof RTU and replace with new RTU, construction of select tenant demising wall, construction of interior non-bearing walls to create (2) conference rooms, a reception area and an open office area, select new door/door frame, select new interior storefront glazing, millwork, new suspended acoustic and gypsum ceiling, new light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  3/19/2019 DONE
BLH sent out final values-they came back-she sent out to Layton Const. instead of Hepworth Family and it came back again-i emailed it to dminegar@laytonconstruction.com
First Notice 2/7/20193/11/2019 DONE
mailed 3-12-19
Permanent Occupancy  1/28/2019 DONE
BLD-Final1/24/20191/25/20191/25/2019PPASS
DetailsJim Storey
Tyler Phone #: ###-####
FIRE-Final Inspection1/24/20191/25/20191/25/2019APASS
DetailsTroy Cobbley
Provide temp address as discussed and provide exit sign or get plan reveiw approval prior to the building inspection.

tyler Phone #: ###-####
BLD-Ceiling Grid Inspection12/31/201812/31/201812/31/2018PPASS
DetailsBrandon Shaw
Tyler Phone #: ###-####
BLD-Framing/Rough-in11/26/201811/27/201811/27/2018APASS
DetailsJim Storey
Tyler Phone #: ###-####
BLD-Wall Bracing11/15/201811/16/201811/16/2018PPASS
DetailsJim Storey
Tyler Phone #: ###-#### walls only ok
Issue PAID IN FULL permit  11/15/2018 DONE
Print Occupancy Form  11/15/2018 DONE
Route to Impact Fee Review11/14/201811/17/201811/14/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)11/8/201811/8/201811/14/2018 PASS
DetailsJavier Guzman
1st rev comp, 11/13 L1 Layton Boise Suite #101 ePlan
Routing - PLAN CHECK11/8/2018 11/14/2018 FAIL
DetailsJavier Guzman
1st review completed  11/14/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK11/14/2018 11/14/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/14/2018 DONE
Permit Ready to Issue  11/14/2018 DONE
Need
GC Form (applicant is GC)
Routing - MECHANICAL11/8/2018 11/8/2018 PASS
DetailsTroy James
Routing - Addressing11/8/2018 11/8/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/8/2018 11/8/2018 PASS
DetailsAngela Hardy
Intake Approval  11/7/2018 PASS
DetailsJavier Guzman
Intake Approval  11/6/2018 FAIL
DetailsJoe Bruce
1) The drawings have been uploaded one page per file, but sheets A-101, A-121, A-401, G-004 through G-012 are missing the space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Please refer to our ePlan upload submittal standards: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2) The mechanical sheets are still missing the information once uploaded into ePlanReview, however we are looking to this issue since it appears that the software is dropping this information on our end. This will not hold up the prescreen process and we will process the plan review once we receive item #1.
Intake Approval  11/5/2018 FAIL
DetailsJoe Bruce
1) Drawings shall be uploaded individually with one sheet per PDF. Please refer to our ePlan upload submittal standards: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
2) Sheet E0.0 (Lighting Compliance COMCheck) - The Lighting Compliance Certificate lists the 2009 IECC. The City of Boise has adopted the 2015 IECC. Revise the Lighting Compliance Certificate to reflect the currently enforced code.
3) Sheet M0.0 - Abbreviations are missing and specifications are incomplete. Revise and correct.
4) Sheet M0.01 - "Sequence of Operation" Notes appears to have missing words/information. Revise and correct.
5) Sheet M0.20 - Incomplete or missing information on the details. Revised and correct.
6) Sheet M1.00 - "Key Notes" are missing from the demo plan. If a mechanical unit is being replaced be sure to note this on the demolition plan as all NEW roof top units require structural calculations to verify the new roof loads.
7) Sheet M2.00 - "Key Notes" are missing from the mechanical plan. Revise and Correct.
Application received  11/1/2018 DONE
Application submitted via PDS Online on Nov 1 2018 9:19AM