Permit Information
Permit NumberBLD18-04006
StatusFinaled
Name HOPPIE LLC
Site Address 1526 S VISTA AVE
Project NameHoppie Bldg - Shamblez
Customer NumberEARLY START BLD18-04007
ePlanReviewNo
Description
(HOPPIE BUILDING - SHAMBLEZ) **Permit to remodel an of existing 2,338 sq ft tenant space for a new retail tenant. Work to include: construction of new interior non-bearing partition walls; new interior relites; new doors and hardware; new interior lighting and electrical work; new rooftop HVAC unit and interior units; and interior finishes to be in compliance with Ch. 8 of the 2015 IBC. This permit is approved contingent upon adhering to the approved plans on file. This building is not fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/15/20196/5/2019 DONE
gave final value when Occupancy was given
Permanent Occupancy  6/5/2019 DONE
Permanent Occupancy  6/5/2019 DONE
BLD-Final5/21/20195/22/20195/22/2019APASS
DetailsJim Storey
Allison- Phone #: ###-####
FIRE-Final Inspection5/21/20195/21/20195/21/2019PPASS
DetailsJim Page
Previously noted items have been corrected, fire exitnguisher was mounted in discussed location at time of inspection. Slide bolts were removed at time of inspection, final life fire safety inspection for area of work complete.

Alician Phone #: ###-####
BLD-Final5/17/20195/20/20195/20/2019PNR
DetailsJim Storey
Allison Phone #: ###-####
FIRE-Final Inspection5/17/20195/20/20195/20/2019AFAIL
DetailsJim Page
Provide fire extinguisher with a current inspection tag and mount as discussed. Remove slide bolt locks (2 are currently installed) on rear doors as discussed, slide bolt locks are not approved per IFC code requirements.

Allison Phone #: ###-####
BLD-Ceiling Grid Inspection12/11/201812/11/201812/11/2018PPART
DetailsJim Sly
Rob-hard lid ceiling cover Phone #: ###-####
Main level existing ceiling joist bays have been sprayed with foam. Electrical passed........OK to cover ceiling with 5/8 firecode rock as shown on approved plan.
Print Occupancy Form  12/10/2018 DONE
Print Occupancy Form  12/10/2018 DONE
Issue PAID IN FULL permit  12/10/2018 DONE
Plan assigned to (JAR)11/2/201811/2/201812/6/2018 DONE
DetailsJulie Romig
*12/06 - 2nd Rev - 1st Rev Comp - L2 Hoppie Bldg Shamblez - Paper
Routing - PLAN CHECK12/3/2018 12/6/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  12/6/2018 DONE
Permit Ready to Issue  12/6/2018 DONE
All Met
Print Occupancy Form  12/6/2018 DONE
Telephone call  12/6/2018 DONE
called Kenneth to let know permit is ready and how much is owed-left message on his phone
Plan resubmittals received  12/3/2018 DONE
two copies of sheet A2.0 taken to julie
Route to Impact Fee Review11/16/201811/19/201811/19/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - MECHANICAL11/15/2018 11/19/2018 PASS
DetailsTroy James
Case Summary (BLD)  11/15/2018 DONE
Routing - PLAN CHECK11/5/2018 11/15/2018 FAIL
DetailsJulie Romig
Plan Review report emailed to applicant. Mechanical engineered drawings required.
1st review completed  11/15/2018 FAIL
DetailsJulie Romig
Plan resubmittals received  11/14/2018 DONE
resubmittals recieved 2 sets of sheet M0.0, M1.0 & M2.0-took to Julie R
Routing - PUBLIC WORKS11/2/2018 11/5/2018 PASS
DetailsMorgan Webb
Routing - Addressing11/2/2018 11/2/2018 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  11/2/2018 DONE
Intake Approval  11/2/2018 PASS
DetailsJulie Romig
Recd Pcfee & Taken To Pln CK  11/2/2018 DONE
Application received 11/2/2018