First Notice | | 6/15/2019 | 6/5/2019 | | DONE |
|
|
|
gave final value when Occupancy was given
|
Permanent Occupancy | | | 6/5/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 6/5/2019 | | DONE |
|
|
|
|
BLD-Final | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Jim Storey
|
|
|
Allison- Phone #: ###-####
|
FIRE-Final Inspection | 5/21/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, fire exitnguisher was mounted in discussed location at time of inspection. Slide bolts were removed at time of inspection, final life fire safety inspection for area of work complete.
Alician Phone #: ###-####
|
BLD-Final | 5/17/2019 | 5/20/2019 | 5/20/2019 | P | NR |
Jim Storey
|
|
|
Allison Phone #: ###-####
|
FIRE-Final Inspection | 5/17/2019 | 5/20/2019 | 5/20/2019 | A | FAIL |
Jim Page
|
|
|
Provide fire extinguisher with a current inspection tag and mount as discussed. Remove slide bolt locks (2 are currently installed) on rear doors as discussed, slide bolt locks are not approved per IFC code requirements.
Allison Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/11/2018 | 12/11/2018 | 12/11/2018 | P | PART |
Jim Sly
|
|
|
Rob-hard lid ceiling cover Phone #: ###-#### Main level existing ceiling joist bays have been sprayed with foam. Electrical passed........OK to cover ceiling with 5/8 firecode rock as shown on approved plan.
|
Print Occupancy Form | | | 12/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/10/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/10/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 11/2/2018 | 11/2/2018 | 12/6/2018 | | DONE |
Julie Romig
|
|
|
*12/06 - 2nd Rev - 1st Rev Comp - L2 Hoppie Bldg Shamblez - Paper
|
Routing - PLAN CHECK | 12/3/2018 | | 12/6/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/6/2018 | | DONE |
|
|
|
All Met
|
Print Occupancy Form | | | 12/6/2018 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2018 | | DONE |
|
|
|
called Kenneth to let know permit is ready and how much is owed-left message on his phone
|
Plan resubmittals received | | | 12/3/2018 | | DONE |
|
|
|
two copies of sheet A2.0 taken to julie
|
Route to Impact Fee Review | 11/16/2018 | 11/19/2018 | 11/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - MECHANICAL | 11/15/2018 | | 11/19/2018 | | PASS |
Troy James
|
|
|
|
Case Summary (BLD) | | | 11/15/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/5/2018 | | 11/15/2018 | | FAIL |
Julie Romig
|
|
|
Plan Review report emailed to applicant. Mechanical engineered drawings required.
|
1st review completed | | | 11/15/2018 | | FAIL |
Julie Romig
|
|
|
|
Plan resubmittals received | | | 11/14/2018 | | DONE |
|
|
|
resubmittals recieved 2 sets of sheet M0.0, M1.0 & M2.0-took to Julie R
|
Routing - PUBLIC WORKS | 11/2/2018 | | 11/5/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 11/2/2018 | | 11/2/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/2/2018 | | PASS |
Julie Romig
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/2018 | | DONE |
|
|
|
|
Application received | | 11/2/2018 | | | |
|
|
|
|