BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Brandon Shaw
|
|
|
Andy-please call 30 minutes prior Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Zoning Approval | 4/15/2019 | 4/15/2019 | 4/15/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00336 and order sheets submitted 4-15-19 for windows and door (attached).
|
BLD-Wall cover | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Tony Young
|
|
|
Jessica Phone #: ###-####,, energy code ok
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Dave Hannah
|
|
|
Call 30 minuites ahead // Jessica Phone #: ###-####
|
Plan assigned to (JAB) Josh | 12/20/2018 | 12/20/2018 | 12/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/20/2018 | | 12/20/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/20/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/20/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/20/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/20/2018 | | DONE |
|
|
|
as per JAB doing plan mod as a walk in
|
BLD-Footing | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Tony Young
|
|
|
Andy Phone #: ###-####,, deck footings ok
|
Routing Walk-In (Zoning) | 11/5/2018 | 11/5/2018 | 11/5/2018 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 11/5/2018 | 11/5/2018 | 11/5/2018 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/5/2018 | | 11/5/2018 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 11/5/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2018 | | DONE |
|
|
|
|
Application received | | 11/5/2018 | | | |
|
|
|
|