BLD-Final | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Garage code s 1905 help yourself Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 4/12/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 2.87
|
BLD-Framing/Rough-in | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Thanks Inspection requested via web by bryan murdoch
|
BLD-Energy code compliance | 1/24/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Dave Hannah
|
|
|
Thanks Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. Install all missing straps on portal frames. Install additional 2x6 studs under C01 3 ply at bearing point. Install the SDS screws on the 3ply C01 truss as shown on the truss engineering. Ok to insulate.
|
BLD-Wall Bracing | 12/19/2018 | 12/21/2018 | 12/21/2018 | A | PART |
Brandon Shaw
|
|
|
First floor only... Vertical straps at port hole framing to be installed befotre framing rough-in...
|
BLD-Foundation | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Dave Hannah
|
|
|
Eric Williams Phone #: ###-####
|
BLD-Footing | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Dave Hannah
|
|
|
Eric Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/15/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/9/2018 | | |
|
|
|
|
Plan assigned to (J_N) | 11/5/2018 | 11/5/2018 | 11/9/2018 | | DONE |
Jenny Nelson
|
|
|
11/16 sfd L1 paper
|
Routing - PLAN CHECK | 11/8/2018 | | 11/9/2018 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 11/9/2018 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 11/9/2018 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2018 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/9/2018 | | DONE |
|
|
|
NEED
RP
|
Inspection Record Card- Bld | | | 11/9/2018 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2018 | | DONE |
|
|
|
Left a message for Doug informing permit is ready, fee amount due and need RP
|
Routing - MECHANICAL | 11/7/2018 | | 11/8/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/6/2018 | 11/9/2018 | 11/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 11/7/2018 | | 11/7/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 11/6/2018 | | 11/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 11/7/2018 | | PASS |
|
|
|
|
Intake Approval | | | 11/5/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/5/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/5/2018 | | DONE |
|
|
|
|
Application received | | 11/5/2018 | | | |
|
|
|
|