BLD-Final | 11/7/2019 | 11/8/2019 | 11/8/2019 | A | DONE |
Tony Young
|
|
|
Roy Phone #: ###-####
|
DOC - Permit Finaled | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 11/7/2019 | 11/7/2019 | 11/7/2019 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | NR |
Dave Hannah
|
|
|
// michael Phone #: ###-#### stiil needs zoning final
|
BLD-Final | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PART |
Tony Young
|
|
|
Call on the way // michael Phone #: ###-####// ok pending historical
|
BLD-Final | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | NR |
Tony Young
|
|
|
Call on the way // michael Phone #: ###-####// needs historical and hand/guard rails to meet code.. address
|
BLD-Final | 10/23/2019 | 10/24/2019 | 10/24/2019 | P | FAIL |
Jim Storey
|
|
|
Michael Phone #: ###-#### need handrails on stairs.
|
BLD-Energy code compliance | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tony Young
|
|
|
Michael Phone #: ###-####,, stairs not ready
|
BLD-Energy code compliance | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | FAIL |
Tony Young
|
|
|
Michael Phone #: ###-####,, needs trades 1st
|
BLD-Conference | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | PART |
Tony Young
|
|
|
Michael Phone #: ###-####,, frame walk through,, needs trades,, nail headers/king studs, add sill bolts, cripples,, stair issues
|
BLD-Framing/Rough-in | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | NR |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Needs to complete the airseal pak.
|
BLD-Wall Bracing | 7/19/2019 | 7/19/2019 | 7/19/2019 | P | CANC |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
BLD-Wall Bracing | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PART |
Tony Young
|
|
|
Bill Phone #: ###-####,, work in progress,, ok
|
Routing Walk-In (BLD) | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Josh Bogle
|
|
|
working through an Idaho Power issue with the 2nd address for the ADU - unclear why ID Power is requiring a 2nd meter
|
Plan assigned to (JAB) Josh | 5/9/2019 | 5/9/2019 | 5/13/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/9/2019 | | 5/13/2019 | | PASS |
Josh Bogle
|
|
|
no changes at this point - applicant will come back in when there is a firm plan
|
CHANGE STATUS TO (ISS) | | | 5/13/2019 | | DONE |
|
|
|
per josh ended up being just questions and not a plan mod
|
Plan Modification Accepted | | | 5/9/2019 | | DONE |
|
|
|
adding window
|
BLD-Footing | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Brandon Shaw
|
|
|
in alley- Michael Phone #: ###-####
|
BLD-Foundation | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | DONE |
Tony Young
|
|
|
rebar, stem wall // Eric Phone #: ###-####
|
BLD-Foundation | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Footing | 3/25/2019 | 3/26/2019 | 3/26/2019 | A | PASS |
Tony Young
|
|
|
please call Michael for access Phone #: ###-####
|
Route to Impact Fee Review | 11/21/2018 | 11/24/2018 | 11/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Route to Impact Fee Review | 11/19/2018 | 11/23/2018 | 11/21/2018 | | PASS |
Eric Bilimoria
|
|
|
|
Telephone call | | | 11/21/2018 | | DONE |
|
|
|
Left voicemail for Michael to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 11/21/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/20/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 11/20/2018 | | DONE |
|
|
|
Met
|
Routing Walk-In (BLD) | 11/19/2018 | 11/19/2018 | 11/19/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 11/6/2018 | 11/6/2018 | 11/19/2018 | | PASS |
Josh Bogle
|
|
|
11/19 ADU, paper - 1st done
|
Routing - PLANNING | 11/19/2018 | | 11/19/2018 | | PASS |
Ted Vanegas
|
|
|
|
Routing - PLAN CHECK | 11/19/2018 | | 11/19/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/19/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 11/8/2018 | | 11/15/2018 | | PASS |
Troy James
|
|
|
Mechanical ventilation with energy star fan to run continuously
|
1st review completed | | | 11/15/2018 | | DONE |
Josh Bogle
|
|
|
|
Routing - Addressing | | | 11/8/2018 | | PASS |
|
|
|
ADU Address: 1819 N 9th St
|
Routing - PUBLIC WORKS | | | 11/8/2018 | | PASS |
|
|
|
|
Routing - PLANNING | 11/6/2018 | | 11/7/2018 | | FAIL |
Ted Vanegas
|
|
|
The first floor of the garage must accomodate a minimum of 2 parking spaces or or two regulation parking spaces must be identified on the site. Otherwise a CUP for a parking reduction must be approved.
|
Routing - PLAN CHECK | 11/7/2018 | | 11/7/2018 | | FAIL |
Josh Bogle
|
|
|
see e-mail 11-7-18
|
Routing Walk-In (BLD) | 11/6/2018 | 11/6/2018 | 11/6/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level two
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/6/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/6/2018 | | DONE |
|
|
|
|
Application received | | 11/6/2018 | | | |
|
|
|
|