Print Statement | | | 11/27/2019 | | DONE |
|
|
|
mailed 2nd notice
|
Print Statement | | | 11/14/2019 | | DONE |
|
|
|
|
Print Statement | | | 10/9/2019 | | DONE |
|
|
|
sent 1st late notice on final fees
|
Print Statement | | | 7/11/2019 | | DONE |
|
|
|
|
First Notice | | 5/13/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Permanent Occupancy | | | 5/3/2019 | | DONE |
|
|
|
|
BLD-Final | 4/10/2019 | 4/10/2019 | 4/11/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Schwartz
|
FIRE-Final Inspection | 4/10/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Jim Page
|
|
|
Approved hardware has been installed on west door, final life fire safety inspection complete.
Phone #: ###-#### Inspection requested via web by Justin Schwartz
|
Temporary Occupancy | 3/21/2019 | 6/19/2019 | 3/21/2019 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PART |
Dave Hannah
|
|
|
I also have the electrical inspection and fire Life Safety scheduled today. Phone #: ###-#### Inspection requested via web by Justin Schwartz ok for tco needs to fix front door
|
FIRE-Final Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the deadbolt has been removed from the west exit door and approved hardware provided.
|
BLD-Conference | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Schwartz,, ?s on final,, needs trades etc.
|
FIRE-Conference | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Phone #: ###-#### Inspection requested via web by Justin Schwartz
|
Print Occupancy Form | | | 3/18/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Schwartz,, walls ok
|
Plan assigned to (CJW) | 12/6/2018 | 12/6/2018 | 1/11/2019 | | PASS |
Carl Westfall
|
|
|
(2nd done) 12/21/18 (L3 - 15 days) (ePlan - 4 sheets) LED Boise (L-3)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/11/2019 | | DONE |
|
|
|
MET
Need
GC Form
|
Issue PAID IN FULL permit | | | 1/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/11/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 1/9/2019 | | 1/10/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 1/8/2019 | | 1/9/2019 | | PASS |
Carl Westfall
|
|
|
Revised occupant loads
|
Plan resubmittals received | | | 1/8/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/3/2019 | 1/6/2019 | 1/4/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 1/3/2019 | | DONE |
|
|
|
|
Routing - FIRE | 12/6/2018 | 12/6/2018 | 12/31/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 12/31/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/6/2018 | | 12/21/2018 | | PASS |
Carl Westfall
|
|
|
Approved with referenced code sections. Time frame not met by Fire.
|
Routing - Addressing | 12/6/2018 | | 12/10/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/6/2018 | | 12/6/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 12/6/2018 | | 12/6/2018 | | FAIL |
Leon Letson
|
|
|
Zoning Certificate required to establish office/performance space. Audience viewing area is not permitted without a Conditional Use Permit for a Parking Reduction.
|
Intake Approval | | | 12/3/2018 | | PASS |
|
|
|
|
Intake Approval | | | 11/30/2018 | | FAIL |
Joe Bruce
|
|
|
1) We need the most recent letter from Suez for the fire flow to the hydrants. This is required to perform our fire department review. Sorry, but I will need this letter prior to starting our review. Provide the Site specific fire flow at hydrants letter from Suez Water.
2) We require mechanical calculations to be stamped by a mechanical engineer. If you received approval from Troy James to have the mechanical plans and calculations stamped by an architect, please provide an email from him stating that an architect may stamp the mechanical plans for this particular project. Upload this email into the documents folder. Due to the increased occupant load for this space, provide mechanical equipment schedule/calculations showing the designed outside air CFM and heating cooling/load will meet the increased demand requirements. The prior vanilla shell permit (BLD17-04481) did not provide calculations for this increased demand of occupants. Contact the mechanical plans examiner/inspector for detailed requirements: Troy James, ###-####, TJames@cityofboise.org
|
Intake Approval | | | 11/15/2018 | | FAIL |
Joe Bruce
|
|
|
1) Form #304 needs to be signed by the owner "Matthew Swank."
2) Provide the Site specific fire flow at hydrants letter from Suez Water.
3) The Interior Lighting Compliance Certificate utilizes the 2012 IECC. The City of Boise has adopted the 2015 IECC. Revise and update the code on the ComCheck.
4) Locate exit signs and emergency lighting on sheet A102. No reference could be found on the reflected ceiling plan locating these items.
5) Due to the increased occupant load for this space, provide mechanical equipment schedule/calculations showing the designed outside air CFM and heating cooling/load will meet the increased demand requirements. The prior vanilla shell permit (BLD17-04481) did not provide calculations for this increased demand of occupants. Contact the mechanical plans examiner/inspector for detailed requirements: Troy James, ###-####, TJames@cityofboise.org
|
Application received | | | 11/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2018 4:12PM
|