Telephone call | | | 1/15/2019 | | DONE |
|
|
|
sent email letting customer know we need the valuation for both ELE permits
|
First Notice | | 12/30/2018 | 1/7/2019 | | DONE |
|
|
|
mailed 1-11-19
|
BLD-Final | 12/19/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Jim Sly
|
|
|
Eli Phone #: ###-####-customer says no ele work done-pleae verify and sign sign off card
|
DOC - Permit Finaled | 12/20/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | PASS |
Mike Jordan
|
|
|
Eli Phone #: ###-####. All life/safety isues have been resolved.
|
Permanent Occupancy | | | 12/20/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/20/2018 | | |
Brian McGowan
|
|
|
As per CM- No plan modification needed; have Architect email new sheets showing/noting the actual operation of the front door (one panel does not function as an egress compliant door) and upload new sheets. Techs to rebatch stamp.
|
FIRE-Final Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide address 4" min contrasting color, provide one 2a10bc fire extinguisher with current inspection tag in normal path of travel, provide exit signs/emergency lights as discussed, provide sticker at main exit as discussed, provie automatic flush bolts and all exit hardware for the in-active leaf of the main exit, provie ADA hardware at the rear exit door, remove the wood lean-to doors as discussed, delete walk-in cooler locks.
Eli Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/19/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/15/2018 | 11/15/2018 | 12/18/2018 | | DONE |
Brian McGowan
|
|
|
12/10 TI L3 ePlan - Craft Brewers of Boise (L-3) - !st Review Complete - Corrections required
|
Routing - PLUMBING | 12/17/2018 | | 12/18/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/18/2018 | | DONE |
|
|
|
MET
NEED
letter from owner
GC
Rev cert of val
|
Route to Impact Fee Review | 12/14/2018 | 12/17/2018 | 12/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PUBLIC WORKS | 12/17/2018 | | 12/17/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLAN CHECK | 12/17/2018 | | 12/17/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 12/14/2018 | | FAIL |
Brian McGowan
|
|
|
See Plan Review Report for Corrections
|
Routing - PLAN CHECK | 11/15/2018 | | 12/14/2018 | | FAIL |
Brian McGowan
|
|
|
See Plan Review Report for Corrections
|
Routing - FIRE | 11/15/2018 | 11/15/2018 | 12/12/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Environmental | 11/15/2018 | | 11/27/2018 | | PASS |
Terry Alber
|
|
|
No food being served. No grease abatement required at this time.
|
Routing - MECHANICAL | 11/26/2018 | | 11/26/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 11/15/2018 | | 11/26/2018 | | PASS |
Daryl Spivey
|
|
|
Install floor sink instead of hub drain for waste receptor on 3 comp. sink. Check premise protection as required. Per plan and ISPC.
|
Routing - PLANNING | 11/15/2018 | | 11/20/2018 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 11/15/2018 | | 11/15/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/15/2018 | | 11/15/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing Off Site - C.D.H | 11/15/2018 | | 11/15/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
No review required per Matt McDonald CDH
|
Intake Approval | | | 11/13/2018 | | PASS |
|
|
|
|
Intake Approval | | | 11/7/2018 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• The plan sheet A2.1 file does not allow me to open the file (non-responsive), re-upload this file
• You mentioned in the checklist that a Mechanical compliance COMcheck was uploaded on sheet M1.1 but there is no such ComCheck shown
|
Application received | | | 11/6/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2018 8:57PM
|