First Notice | | 7/20/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
Permanent Occupancy | | | 7/10/2020 | | DONE |
|
|
|
|
BLD-Final | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by chad stradley
|
BLD-Aging Inspection | 7/6/2020 | 7/6/2020 | 7/8/2020 | | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 5/27/2020 | 5/27/2020 | 5/27/2020 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Aging Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 4/28/2020 | 4/28/2020 | 4/28/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Change Expiration Date Only | | | 4/24/2020 | | DONE |
|
|
|
90 day extension per Jason Blais. See DOCs
|
Telephone call | | | 4/23/2020 | | DONE |
|
|
|
Emailed Jerod Pogue at Wright Brothers to let him know his TCO will expire soon and to request an extension from Jason Blais
|
Telephone call | | | 3/26/2020 | | DONE |
|
|
|
emailed GC TCO courtsey letter. See Docs.
|
BLD-Aging Inspection | 3/3/2020 | 3/3/2020 | 3/3/2020 | | PASS |
Jim Storey
|
|
|
|
Change Expiration Date Only | | | 1/22/2020 | | DONE |
|
|
|
per Jason Blais - see DOCS
|
Telephone call | | | 1/22/2020 | | DONE |
|
|
|
Request for TCO extension approved per Jason Blais. See DOCS
|
BLD-Aging Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | | DONE |
Jim Storey
|
|
|
|
Meeting | | | 11/7/2019 | | DONE |
|
|
|
changed back to temp c of o due to phase one not being fully completed. emailed the customer informing them and to contact Joe if they have questions.
|
Temporary Occupancy | 10/30/2019 | 1/28/2020 | 10/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Temporary Occupancy | 10/30/2019 | 1/28/2020 | 10/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Print Occupancy Form | | | 10/30/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/30/2019 | | DONE |
|
|
|
|
BLD-Final | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Jim Storey
|
|
|
Fire life and safety will be out in the AM. Phone #: ###-#### Inspection requested via web by chad stradley temp ok pending others
|
FIRE-Final Inspection | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signature provided on signature card.
Larry Phone #: ###-####
|
PubWorks Occupancy Approval | 10/25/2019 | 10/25/2019 | 10/25/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval Temp | 10/18/2019 | 10/18/2019 | 10/18/2019 | | PASS |
Katelyn Menuge
|
|
|
BND19-00190
|
BLD-Framing/Rough-in | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by chad stradley
|
BLD-Footing | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Jim Storey
|
|
|
rebar inspection Phone #: ###-#### Inspection requested via web by chad stradley
|
CHANGE STATUS TO (ISS) | | | 5/3/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JHB) | 3/21/2019 | 3/21/2019 | 5/2/2019 | | PASS |
Joe Bruce
|
|
|
05/01 (Plan Mod) Falcon One Storage Condos
|
Routing - PLAN CHECK | 5/1/2019 | | 5/2/2019 | | PASS |
Joe Bruce
|
|
|
**Plan Modificaiton Passed Plan Review**
|
Permit Ready to Issue | | | 5/2/2019 | | DONE |
|
|
|
Plan mod approved (plan mod fees under BLD19-03877 main case)
(DO NOT REISSUE or sign off in eplan with out all three BLD18-04075, BLD18-04076 and BLD19-00317 permits have been changed to issued after plan mod fees are paid)
|
Routing - PLAN CHECK | 4/17/2019 | | 5/1/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 4/17/2019 | | 5/1/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
Plan resubmittals requested | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
Emailed Matt McAnulty the comments for resubmittal.
|
Plan resubmittals received | | | 5/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan Modification Accepted | | | 4/17/2019 | | DONE |
Joe Bruce
|
|
|
PLAN MODIFICATION for buildings #7, #8A, & #8B to revise light gauge metal framing to pre-fab metal building.
|
Plan Modification Accepted | | | 4/16/2019 | | FAIL |
Joe Bruce
|
|
|
|
Intake Approval | | | 3/22/2019 | | FAIL |
Joe Bruce
|
|
|
1) Provide a stamp by an Idaho licensed engineer on the new metal building drawings.
2) The metal building drawings do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block. Verify ALL new plan sheets have the required space for city approval stamp.
3) The metal building drawings to not meet our minimum requirements. Minimum sheet size accepted is 18”x24”.
4) Provide structural calculations for the metal buildings. These shall be stamped/signed by an Idaho licensed engineer.
5) The metal building drawings do not match the architectural drawings. All architectural drawings must be updated to match the new metal building drawings for buildings 7 and 8. Floorplans, elevations, details, and sections shall be updated to reflect the new structure for buildings 7 and 8. Continuity of fire barrier must be maintained.
6) Update sheet G-001 with the new drawings added to the sheet index.
|
Plan Modification Accepted | | | 3/21/2019 | | DONE |
|
|
|
Plan mod accepted e plan-changes to structural including footings & framing design for Bldg 7, 8A & 8B-sheets S2.8.1, S4.8.1, 8(A) and struc calcs-assigned to Joe B
|
BLD-Footing | 3/7/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Mike Jordan
|
|
|
to include UFER inspection Phone #: ###-#### Inspection requested via web by chad stradley. South retaing wall footing, building 8A.
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
Need
Revised Value- (for each building)
(DO NOT ISSUE WITHOUT ALL PERMITS, BLD18-03877, BLD18-04070 TO BLD18-04076, BLD19-00314 TO BLD19-000317)
|
Issue PAID IN FULL permit | | | 2/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/13/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 11/14/2018 | 11/14/2018 | 2/11/2019 | | PASS |
Joe Bruce
|
|
|
(3rd Rev Comp) 12/07 - (502) Falcon One Storage Condos Bldg 8(A)
|
Routing Off Site - STRUCTURAL | 2/8/2019 | | 2/11/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/8/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 2/6/2019 | | FAIL |
Joe Bruce
|
|
|
Structural resubmittal required.
|
Routing Off Site - STRUCTURAL | 1/30/2019 | | 2/6/2019 | | FAIL |
Joe Bruce
|
|
|
See structural comment in the Agency Comments folder for remaining issue to address. Provide a complete written response outlining the analysis method you are taking responsibility for.
|
Routing PW Sewer Design | 1/30/2019 | | 1/31/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - FIRE | 1/17/2019 | 1/17/2019 | 1/30/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan resubmittals requested | | | 1/30/2019 | | FAIL |
Joe Bruce
|
|
|
PW Sewer and Structutral have additional comments. **JHB**
|
Plan resubmittals received | | | 1/30/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 1/17/2019 | | 1/28/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 1/17/2019 | | 1/25/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Sewer Design | 1/17/2019 | | 1/23/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - Design Review | 1/17/2019 | | 1/18/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Plan Reviewer's activity | | | 1/17/2019 | | DONE |
Joe Bruce
|
|
|
Had applicant upload corrected resubmittal drawings with architect stamp, city approval stamp area, and remove NOT FOR PERMIT language from drawings. **JHB**
|
Plan resubmittals received | | | 1/17/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 12/12/2018 | 12/15/2018 | 12/12/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 11/14/2018 | 11/14/2018 | 12/12/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing PW Drainage | 12/6/2018 | | 12/12/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 12/6/2018 | | 12/12/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 12/6/2018 | | 12/12/2018 | | FAIL |
DeAnn Brown
|
|
|
Please add tap permit language described in changemarks on sheet C4.0.
|
1st review completed | | | 12/12/2018 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 12/12/2018 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 11/14/2018 | | 12/7/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2018 | | 12/6/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 11/14/2018 | | 12/6/2018 | | PASS |
Andy J. Long
|
|
|
No ESC review or ESC permit required, ESC permit for project already issued, see ESC18-01289.
|
Routing Off Site - STRUCTURAL | 11/14/2018 | | 11/29/2018 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing - MECHANICAL | 11/14/2018 | | 11/26/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLUMBING | 11/14/2018 | | 11/16/2018 | | PASS |
Dan Ediger
|
|
|
Per Plans and ISPC
|
Routing - Design Review | 11/14/2018 | | 11/16/2018 | | FAIL |
Katelyn Menuge
|
|
|
See Changemarks
|
Routing - PLANNING | 11/14/2018 | | 11/15/2018 | | PASS |
Leon Letson
|
|
|
Storage is an allowed use in the M-1D zone.
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
Facility Address: 2140 E Summersweet Dr.
|
Intake Approval | | | 11/7/2018 | | |
|
|
|
|
Intake Approval | | | 11/7/2018 | | |
|
|
|
|
Intake Approval | | | 11/7/2018 | | PASS |
|
|
|
|
Second Notice | | 8/21/2020 | | | |
|
|
|
|
Application received | | 11/7/2018 | | | |
|
|
|
|
Application received | | 11/7/2018 | | | |
|
|
|
|