BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | DONE |
Tony Young
|
|
|
4.05
|
BLD-Final | 6/27/2019 | 7/1/2019 | 7/1/2019 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin.. Mech. final has failed.
|
BLD-Energy code compliance | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Sly
|
|
|
Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | FAIL |
Tony Young
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Scott Asin// c/n posted,, needs 6 sided coverage on all walls,,, fix gap above the front door
|
BLD-Framing/Rough-in | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Storey
|
|
|
The Framer ask if you could call him before hand. He would like to be there to solve any problems. Stevie Alters ###-####
Thank you Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Wall Bracing | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, exterior ok
|
BLD-Foundation | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PART |
Tony Young
|
|
|
Manny-would late AM if possible Phone #: ###-####
|
BLD-Footing | 2/4/2019 | 2/5/2019 | 2/5/2019 | A | PASS |
Tony Young
|
|
|
trying to pour around 1pm // Victor Phone #: ###-####
|
Inspection Record Card- Bld | | | 1/31/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/31/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/30/2018 | 11/30/2018 | 12/20/2018 | | DONE |
Brian McGowan
|
|
|
11/27 - Corrections Required
|
Routing - PLAN CHECK | 12/20/2018 | | 12/20/2018 | | PASS |
Brian McGowan
|
|
|
|
Override - Parcel Holds | | | 12/20/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 12/20/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 12/19/2018 | | 12/19/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - PLANNING | 11/21/2018 | | 11/21/2018 | | FAIL |
Leon Letson
|
|
|
PUD must be modified to allow for design change.
|
CHANGE STATUS TO (REV) | | | 11/21/2018 | | DONE |
|
|
|
need to complete a staff-level modification to their PUD. The elevations are dramatically different than what we approved 11/21/18 per Leon
|
OVERRIDE | | | 11/20/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 11/14/2018 | 11/14/2018 | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
11/27 sfd L1 ePlan
|
Routing - PLAN CHECK | 11/14/2018 | | 11/20/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/20/2018 | | DONE |
|
|
|
met
|
Routing - MECHANICAL | 11/14/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/14/2018 | 11/17/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/15/2018 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/14/2018 | | PASS |
|
|
|
4706 N Eugene St was the address before they split the lot into 6 lots on lucky. The Demo was pulled for 4706 N Eugene St BLD18-04079 (1st home to be submitted) so credit has been applied for the 6 lots
|
Routing - PLANNING | 11/14/2018 | | 11/14/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 11/8/2018 | | FAIL |
|
|
|
Please upload all documents into the documents and upload all plan sheets individually
|
Application received | | | 11/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 7 2018 3:09PM
|