BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | DONE |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin// 5.0
|
BLD-Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | NR |
Tony Young
|
|
|
Garage code 2746 for both homes Phone #: ###-#### Inspection requested via web by Scott Asin,, correction posted,, needs tempered glass x2,, needs opening control device in upstairs bed room for fall protection
|
BLD-Blower Door Test Results | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | DONE |
Tony Young
|
|
|
Garage code 2746 for both homes Phone #: ###-#### Inspection requested via web by Scott Asin// 5.0
|
BLD-Wall cover | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin// interior shear
|
BLD-Energy code compliance | 4/3/2019 | 4/3/2019 | 4/4/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, will need interior shear nail inspection
|
BLD-Energy code compliance | 4/1/2019 | 4/2/2019 | 4/2/2019 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, c/n not completed,, do not cover
|
BLD-Framing/Rough-in | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Foundation | 12/28/2018 | 12/31/2018 | 12/31/2018 | A | PASS |
Jim Sly
|
|
|
wall // Victor Phone #: ###-####
|
BLD-Footing | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | PASS |
Tony Young
|
|
|
Armando Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/21/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/18/2018 | | |
|
|
|
|
OVERRIDE | | | 12/18/2018 | | |
|
|
|
|
OVERRIDE | | | 12/18/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 12/4/2018 | 12/4/2018 | 12/18/2018 | | DONE |
Brian McGowan
|
|
|
11/27 - Corrections Required - Re-assigned from Rob to Brian due to Rob's absence.
|
Routing - PLANNING | 12/18/2018 | | 12/18/2018 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 12/18/2018 | | 12/18/2018 | | PASS |
Brian McGowan
|
|
|
As per RDP review. Planning passed it.
|
Override - Parcel Holds | | | 12/18/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 12/18/2018 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 11/30/2018 | 11/30/2018 | 12/4/2018 | | DEFR |
Rob Patrick
|
|
|
Re-assigned from Rob to Brian due to Rob's absence.
|
Routing - PLANNING | 11/21/2018 | | 11/21/2018 | | FAIL |
Leon Letson
|
|
|
PUD must be modified to allow for design change.
|
CHANGE STATUS TO (REV) | | | 11/21/2018 | | DONE |
|
|
|
still needs P & Z approval
|
OVERRIDE | | | 11/20/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 11/20/2018 | 11/20/2018 | 11/20/2018 | | DONE |
Rob Patrick
|
|
|
11/27 sfd L1 ePlan
|
Plan assigned to (BJM) | 11/14/2018 | 11/14/2018 | 11/20/2018 | | DEFR |
Brian McGowan
|
|
|
11/27 sfd L1 ePlan
|
Routing - PLANNING | 11/14/2018 | | 11/20/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLAN CHECK | 11/20/2018 | | 11/20/2018 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 11/20/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 11/20/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 11/14/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/14/2018 | 11/17/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/15/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/9/2018 | | FAIL |
|
|
|
Drawings need to be uploaded individually. Please make sure they face landscape style and that the bottom right corner is left open for our approval stamp. Some of the drawings have the wrong code year one them,,,,please correct with the correct code year. Please also provede a cross section of the whole building
|
Application received | | | 11/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 8 2018 10:47AM
|