Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-04091
StatusUnder Review
Name LIBERTY CONSTRUCTION CONTRACTORS LL
Site Address 1003 E FRANKLIN ST
Project NameHouse move
Customer NumberDEMO BLD99-01208
ePlanReviewNo
Description
***HOUSE MOVE*** Permit is for foundation, basement, and stairs only. The existing SFD was 1,562 sqft. New SFD will be 1,562 first floor and 1,562 unfinished basements. Seperate permits required for mechanical, electrical, and plumbing. See approved plans. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Modification Accepted  4/29/2020 DONE
Plan Mod in place to correct setback issues. Please route to Josh (Michael is unable to complete) & Kevin Holmes for review.

Stamp all plans when approved.
BLD-Footing3/5/20203/5/20203/5/2020PFAIL
DetailsTell Riley
Logan Phone #: ###-####//front setbacks need to be minimum of 20 feet per planning//measured onsite of 13 feet to front pop-out and 15 feet to main house from pins//sides ok, rear ok//
Routing - PLANNING3/5/2020 3/5/2020 PASS
DetailsKevin Holmes
Required setback is 15 ft. for living space, 20 ft. for garage or parking
BLD-Other9/23/20199/23/20199/23/2019PDONE
DetailsBob Archibald
No work in progress
Fees Due Hold12/7/2018 12/27/2018 DONE
DetailsTisha Gallop
see Tisha
Telephone call  12/6/2018 DONE
left vm for Logan regarding returned payment
BLD-Conference12/4/201812/4/201812/5/2018PPASS
DetailsDave Hannah
call about building being placed on the parcel line called owner house looks ok on lot but need to see plot plan
OVERRIDE  11/27/2018  
Issue PAID IN FULL permit  11/27/2018 DONE
Routing - PLAN CHECK11/20/2018 11/27/2018 PASS
DetailsMichael Hanson
Case Summary (BLD)  11/27/2018 DONE
DetailsMichael Hanson
Routing - PLANNING11/27/2018 11/27/2018 PASS
DetailsColleen T Carroll
PLANS/APPL TAKEN TO FRONT DESK  11/27/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  11/27/2018 DONE
Plan assigned to (M_H)11/8/2018 11/27/2018 DONE
DetailsMichael Hanson
11/21 #402 L1 ePlan. 1st review completed - See emailed plan review report for corrections required. MDH
Plan resubmittals received  11/26/2018 DONE
received two copies (11x17) site plan, foundation plan, floor plan, basement plan, section details; taken to Michael Hanson
Routing - MECHANICAL11/26/2018 11/26/2018 PASS
DetailsTroy James
No mechanical systems being installed. Baseboard heat.
Routing - PLAN CHECK11/16/2018 11/20/2018 FAIL
DetailsMichael Hanson
See emailed plan review report for corrections required. MDH
1st review completed  11/20/2018 FAIL
DetailsMichael Hanson
See emailed plan review report for corrections required. MDH
Routing - MECHANICAL11/13/2018 11/16/2018 FAIL
DetailsTroy James
Unable to make contact with applicant
Routing - PLANNING11/9/2018 11/13/2018 FAIL
DetailsColleen T Carroll
Needs to show compliant parking
Route to Impact Fee Review11/8/201811/14/201811/9/2018 PASS
DetailsEric Bilimoria
Routing - PUBLIC WORKS11/8/2018 11/9/2018 PASS
DetailsAngela Hardy
Intake Approval  11/8/2018 PASS
Routing - Addressing11/8/2018 11/8/2018 PASS
DetailsDoug Chausow
Plan assigned to (JAB) Josh4/29/20204/29/2020   
DetailsJosh Bogle
* mod - not loaded in ePlan as of 08/13
Application received 11/8/2018