BLD-Final | 2/7/2019 | 2/8/2019 | 2/8/2019 | A | DONE |
Tony Young
|
|
|
(STAN''S GOLF CARS), (CLUBCAR)- (CSN18-00295) Permit to install (2) illuminated (s/f cabinet). Stan''s Golf Cars is new, CLUBCAR is being relocated. Attachments are required to resist all gravity, snow, wind and seismic loads with appropriate safety factors. Install as per approved drawings, engineering and local codes. ***BJM*** Phone #: ###-#### Inspection requested via web by Ken Olsen
|
DOC - Permit Finaled | 2/8/2019 | 2/8/2019 | 2/8/2019 | P | PASS |
Tony Young
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/14/2018 | 11/14/2018 | 12/4/2018 | | DONE |
Brian McGowan
|
|
|
CSN18-00295- Corrections required- Update to 2015 IBC
|
Plan Reviewer's activity | | | 12/4/2018 | | DONE |
Brian McGowan
|
|
|
Passing this as discussed with Christina so C of O can be requested for the businesses. The two signs may need to be resubmitted as two separate applications.
|
Intake Approval | | | 12/4/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 12/4/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/4/2018 | | 12/4/2018 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/4/2018 | | DONE |
|
|
|
NEED C OF O -- met (BLD18-04530)
|
Intake Approval | | | 11/16/2018 | | FAIL |
Brian McGowan
|
|
|
Engineering must specify 2015 IBC
|
Application received | | | 11/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 9 2018 1:37PM
|
First Notice | 2/8/2019 | 2/8/2019 | | | |
Tony Young
|
|
|
|