BLD-Final | 9/15/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/5/2019 | 7/5/2019 | 7/5/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | NR |
Brandon Shaw
|
|
|
Need PW appoval...
|
BLD-Blower Door Test Results | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.97
|
BLD-Other | 3/25/2019 | 3/25/2019 | 3/25/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Energy code compliance | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Framing/Rough-in | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Blower Door Test Results | 3/1/2019 | 3/1/2019 | 3/1/2019 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 12/27/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progess... Frost protection is required...
|
BLD-Footing | 12/25/2018 | 12/26/2018 | 12/26/2018 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 12/26/2018 | 12/26/2018 | 12/26/2018 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | NR |
Brandon Shaw
|
|
|
Need soil sub-grade letter submitted and approved by PW...
|
Inspection Record Card- Bld | | | 12/6/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/6/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/26/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 11/14/2018 | 11/14/2018 | 11/26/2018 | | DONE |
Brian McGowan
|
|
|
12/3 sfd L2 ePlan
|
Routing - PLAN CHECK | 11/14/2018 | | 11/26/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 11/26/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/26/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/26/2018 | | DONE |
|
|
|
met
|
Routing - FIRE | 11/14/2018 | 11/14/2018 | 11/16/2018 | | PASS |
Lee G Meredith
|
|
|
Sprinklers not required - optional.
|
Routing PW Grading-Hillside | 11/14/2018 | | 11/16/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Routing - MECHANICAL | 11/14/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/14/2018 | 11/17/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 11/14/2018 | | 11/14/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/14/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/14/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 11/14/2018 | | 11/14/2018 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/14/2018 | | DONE |
|
|
|
|
Application received | | | 11/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 12 2018 11:35AM
|