BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
call to meet // lance Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 9/20/2019 | 9/20/2019 | 9/20/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | P | DONE |
Brandon Shaw
|
|
|
Pre-final walk thru...
|
Routing - MECHANICAL | 9/10/2019 | | 9/10/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Energy code compliance | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 6/19/2019 | 6/20/2019 | 6/24/2019 | P | PASS |
Brandon Shaw
|
|
|
Lanz Phone #: ###-####- please call for access
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/24/2019 | P | CANC |
Brandon Shaw
|
|
|
Lanz Phone #: ###-####- Please call for access
|
Routing - MECHANICAL | 6/21/2019 | | 6/21/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Brandon Shaw
|
|
|
No framing... Second floor shear only...
|
BLD-Wall Bracing | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PART |
Brandon Shaw
|
|
|
1st fl. only...
|
BLD-Footing | 5/21/2019 | 5/22/2019 | 5/22/2019 | A | NR |
Brandon Shaw
|
|
|
Need Geo soil subgrade submitted and approved by PW...
|
BLD-Footing | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 3/15/2019 | 3/15/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
Lance Phone #: ###-####
|
BLD-Footing | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | NR |
Mike Jordan
|
|
|
|
BLD-Footing | 3/13/2019 | 3/14/2019 | 3/14/2019 | P | NR |
Mike Jordan
|
|
|
David Phone #: ###-####. Geo tech report not yet submitted and approved.
|
PubWorks Subgrade Approval | 3/14/2019 | 3/14/2019 | 3/14/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.
|
OVERRIDE | | | 2/26/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 2/15/2019 | 2/15/2019 | 2/26/2019 | | DONE |
Jenny Nelson
|
|
|
Plan mod - retaining wall
|
Telephone call | | | 2/26/2019 | | DONE |
|
|
|
Spoke with Lance to inform him the plan mod is approved and ready. Informed him what fees are due.
|
CHANGE STATUS TO (ISS) | | | 2/26/2019 | | DONE |
|
|
|
plan mod
|
Routing - PLAN CHECK | 2/26/2019 | | 2/26/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
1st review completed | | | 2/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 2/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2019 | | DONE |
|
|
|
plan mod approved
|
Routing - PUBLIC WORKS | 2/20/2019 | | 2/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 2/20/2019 | | 2/20/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan Modification Accepted | | | 2/15/2019 | | DONE |
|
|
|
Spoke with Melissa J, plan mod for a retaining wall. Three copies each off C1, C1.1, GD.1,, GD.2, GD.3 and ESC.1 stamped plans and taken to reviewer.
|
Issue PAID IN FULL permit | | | 2/5/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 2/4/2019 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 2/4/2019 | | 2/4/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
OVERRIDE | | | 12/28/2018 | | |
|
|
|
|
Telephone call | | | 12/28/2018 | | DONE |
|
|
|
Left a message for Lance informing this permit is ready and the fee amount due for issuance.
|
Inspection Record Card- Bld | | | 12/28/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/28/2018 | | DONE |
|
|
|
met
|
Plan assigned to (J_N) | 11/16/2018 | 11/16/2018 | 12/27/2018 | | DONE |
|
|
|
12/4 sfd L2 paper, Failed fire. 1st complete 12/5 waiting on ESC and Fire to review.
|
Routing - FIRE | 12/7/2018 | 11/16/2018 | 12/27/2018 | | PASS |
Lee G Meredith
|
|
|
New SFH Paper
12-17-18 Requires Suez fire flow documentation letter. LGM
12-27-18 Suez fire flow documentation letter received and indicates minimum required flow is available. Documentation received that shows fire access of 150 ft. is provided.
|
Case Summary (BLD) | | | 12/27/2018 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2018 | | DONE |
Jenny Nelson
|
|
|
|
1st review completed | | | 12/17/2018 | | FAIL |
Jenny Nelson
|
|
|
Fire last to review on 12/17. Failed fire
|
Routing - Erosion and Sediment | 12/5/2018 | | 12/7/2018 | | PASS |
Andy J. Long
|
|
|
ESC site map with BMPs approved. Contractor needs to identify certified Responsible Person prior to issue. Site Preparation Inspection required prior to construction.
|
Routing - PLAN CHECK | | | 12/5/2018 | | PASS |
Jenny Nelson
|
|
|
|
Routing - PUBLIC WORKS | 11/27/2018 | | 12/4/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 12/4/2018 | | 12/4/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 11/28/2018 | | 12/4/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.
|
Plan resubmittals received | | | 11/27/2018 | | DONE |
|
|
|
Two copies of sheets 0.0, 1.0, 1.1, 2.0,2.1, 3.0, 3.1, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0. 12.0 and 13.0 per Jenny & Brian took to public works due to their fail and to go to planning for their fail. customer turned in full new set of plans
|
Routing - MECHANICAL | 11/21/2018 | | 11/26/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 11/19/2018 | | 11/21/2018 | | FAIL |
Melissa Jannusch
|
|
|
Roof drains
|
Plan resubmittals received | | | 11/21/2018 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plan sheets marked C1.0, C1.1, GD.1, GD.2, GD.3 & ESC.1; Plans stamped and taken to JJN for review and routing
|
Route to Impact Fee Review | 11/16/2018 | 11/19/2018 | 11/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 11/16/2018 | | 11/19/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 11/19/2018 | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|
CHANGE STATUS TO (PND) | | | 11/16/2018 | | DONE |
|
|
|
fees need paid before we start review
|
Plans ACCEPTED BY PLAN TECH | | | 11/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/16/2018 | | DONE |
|
|
|
|
Meeting | | | 11/16/2018 | | DONE |
|
|
|
existing home was on 3523 E Via Estancia Ln
|
Telephone call | | | 11/15/2018 | | DONE |
|
|
|
called Lance about drawings we need to have submitted before i can start the review process-couldn't leave a message his mail box is full-will email llschaffer@live.com
|
Application received | | 11/13/2018 | | | |
|
|
|
|
Routing - PLANNING | 11/21/2018 | | | | FAIL |
|
|
|
Balcony on west side projects into side yard setback. Spoke with applicant will submit revised siteplan.
|