Permit Information
Permit NumberBLD18-04125
StatusFinaled
Name SCHAFFER CONSTRUCTION LLC
Site Address 3545 E VIA ESTANCIA LN
Project NameWaral Residence
Customer Number 
ePlanReviewNo
Description
**Plan Modification for additional retaining wall starting at east side of house**HILLSIDE** **WUI ZONE 'B' CLASS 'A' ROOF REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** CAT 1 HILLSIDE PERMIT-Permit for the construction of a new 4353 sq. ft., two story (first story 3305 sq. ft., second story 1048 sq. ft.) single family dwelling with 4 bedrooms, 4 bathrooms, approximately 854 sq. ft. of covered patio/porch and a 715 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJNA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.

Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
call to meet // lance Phone #: ###-####
DOC - Permit Finaled9/20/20199/20/20199/20/2019PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval9/20/20199/20/20199/20/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Final9/16/20199/17/20199/17/2019PDONE
DetailsBrandon Shaw
Pre-final walk thru...
Routing - MECHANICAL9/10/2019 9/10/2019 PASS
DetailsTroy James
New manual j report
BLD-Energy code compliance6/25/20196/26/20196/26/2019APASS
DetailsBrandon Shaw
OK to cover
BLD-Framing/Rough-in6/19/20196/20/20196/24/2019PPASS
DetailsBrandon Shaw
Lanz Phone #: ###-####- please call for access
BLD-Energy code compliance6/19/20196/20/20196/24/2019PCANC
DetailsBrandon Shaw
Lanz Phone #: ###-####- Please call for access
Routing - MECHANICAL6/21/2019 6/21/2019 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Framing/Rough-in6/10/20196/10/20196/10/2019PPASS
DetailsBrandon Shaw
No framing...
Second floor shear only...
BLD-Wall Bracing5/24/20195/24/20195/24/2019PPART
DetailsBrandon Shaw
1st fl. only...
BLD-Footing5/21/20195/22/20195/22/2019ANR
DetailsBrandon Shaw
Need Geo soil subgrade submitted and approved by PW...
BLD-Footing3/26/20193/26/20193/26/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing3/15/20193/15/20193/18/2019PPASS
DetailsDave Hannah
Lance Phone #: ###-####
BLD-Footing3/14/20193/14/20193/14/2019PNR
DetailsMike Jordan
BLD-Footing3/13/20193/14/20193/14/2019PNR
DetailsMike Jordan
David Phone #: ###-####. Geo tech report not yet submitted and approved.
PubWorks Subgrade Approval3/14/20193/14/20193/14/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.

OVERRIDE  2/26/2019  
Plan assigned to (J_N)2/15/20192/15/20192/26/2019 DONE
DetailsJenny Nelson
Plan mod - retaining wall
Telephone call  2/26/2019 DONE
Spoke with Lance to inform him the plan mod is approved and ready. Informed him what fees are due.
CHANGE STATUS TO (ISS)  2/26/2019 DONE
plan mod
Routing - PLAN CHECK2/26/2019 2/26/2019 PASS
DetailsJenny Nelson
1 hour plan mod fee
1st review completed  2/26/2019 DONE
DetailsJenny Nelson
Case Summary (BLD)  2/26/2019 DONE
DetailsJenny Nelson
Inspection Record Card- Bld  2/26/2019 DONE
Permit Ready to Issue  2/26/2019 DONE
plan mod approved
Routing - PUBLIC WORKS2/20/2019 2/22/2019 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside2/20/2019 2/20/2019 PASS
DetailsMelissa Jannusch
PLAN MOD APPROVED
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Plan Modification Accepted  2/15/2019 DONE
Spoke with Melissa J, plan mod for a retaining wall. Three copies each off C1, C1.1, GD.1,, GD.2, GD.3 and ESC.1 stamped plans and taken to reviewer.
Issue PAID IN FULL permit  2/5/2019 DONE
Plan Modification Accepted  2/4/2019 DONE
New manual j report
Routing - MECHANICAL2/4/2019 2/4/2019 PASS
DetailsTroy James
Resubmitted manual j report
OVERRIDE  12/28/2018  
Telephone call  12/28/2018 DONE
Left a message for Lance informing this permit is ready and the fee amount due for issuance.
Inspection Record Card- Bld  12/28/2018 DONE
Permit Ready to Issue  12/28/2018 DONE
met
Plan assigned to (J_N)11/16/201811/16/201812/27/2018 DONE
Details
12/4 sfd L2 paper, Failed fire. 1st complete 12/5 waiting on ESC and Fire to review.
Routing - FIRE12/7/201811/16/201812/27/2018 PASS
DetailsLee G Meredith
New SFH Paper

12-17-18 Requires Suez fire flow documentation letter. LGM

12-27-18 Suez fire flow documentation letter received and indicates minimum required flow is available. Documentation received that shows fire access of 150 ft. is provided.
Case Summary (BLD)  12/27/2018 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  12/27/2018 DONE
DetailsJenny Nelson
1st review completed  12/17/2018 FAIL
DetailsJenny Nelson
Fire last to review on 12/17. Failed fire
Routing - Erosion and Sediment12/5/2018 12/7/2018 PASS
DetailsAndy J. Long
ESC site map with BMPs approved. Contractor needs to identify certified Responsible Person prior to issue. Site Preparation Inspection required prior to construction.
Routing - PLAN CHECK  12/5/2018 PASS
DetailsJenny Nelson
Routing - PUBLIC WORKS11/27/2018 12/4/2018 PASS
DetailsAngela Hardy
Routing - PLANNING12/4/2018 12/4/2018 PASS
DetailsColleen T Carroll
Routing PW Grading-Hillside11/28/2018 12/4/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call ###-#### for an inspection.

Plan resubmittals received  11/27/2018 DONE
Two copies of sheets 0.0, 1.0, 1.1, 2.0,2.1, 3.0, 3.1, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0. 12.0 and 13.0 per Jenny & Brian took to public works due to their fail and to go to planning for their fail. customer turned in full new set of plans
Routing - MECHANICAL11/21/2018 11/26/2018 PASS
DetailsTroy James
Routing PW Grading-Hillside11/19/2018 11/21/2018 FAIL
DetailsMelissa Jannusch
Roof drains
Plan resubmittals received  11/21/2018 DONE
DetailsChristina Prado
Received three sets of revised plan sheets marked C1.0, C1.1, GD.1, GD.2, GD.3 & ESC.1; Plans stamped and taken to JJN for review and routing
Route to Impact Fee Review11/16/201811/19/201811/19/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing11/16/2018 11/19/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  11/19/2018 FAIL
SEE HILLSIDE FOR FAIL
CHANGE STATUS TO (PND)  11/16/2018 DONE
fees need paid before we start review
Plans ACCEPTED BY PLAN TECH  11/16/2018 DONE
Intake Approval  11/16/2018 PASS
Recd Pcfee & Taken To Pln CK  11/16/2018 DONE
Meeting  11/16/2018 DONE
existing home was on 3523 E Via Estancia Ln
Telephone call  11/15/2018 DONE
called Lance about drawings we need to have submitted before i can start the review process-couldn't leave a message his mail box is full-will email llschaffer@live.com
Application received 11/13/2018   
Routing - PLANNING11/21/2018   FAIL
Balcony on west side projects into side yard setback. Spoke with applicant will submit revised siteplan.