First Notice | | 8/19/2019 | 9/20/2019 | | DONE |
|
|
|
mailed 9-23-19
|
Permanent Occupancy | | | 8/9/2019 | | DONE |
|
|
|
|
BLD-Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Mike Jordan
|
|
|
You will need to call Dave ###-#### AND code 0688 for the front door lock box. Phone #: ###-#### Inspection requested via web by Brandon Sorensen. OK for perm occ.
|
FIRE-Final Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. The contractor, TVR, stated all wiring was explosion proof.
You will need to call Dave ###-#### AND code 0688 for the front door lock box. Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
BLD-Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | CANC |
Mike Jordan
|
|
|
You will need to call Dave ###-#### AND door code 0688 for access. Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen Inspection cancelled from web by: Brandon Sorensen
|
FIRE-Final Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | P | FAIL |
Troy Cobbley
|
|
|
I need verification that all electrical in the FInishing Room is explosion proof. Need a racking permit for the rack that exceeds 8'-0".
You will need to call Dave ###-#### AND door code 0688 for access. Phone #: ###-#### Inspection requested via web by Brandon Sorensen
|
BLD-Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | NR |
Mike Jordan
|
|
|
For access, call Dave ###-#### AND door code 0688 for front door lock box. Phone #: ###-#### Inspection requested via web by Brandon Sorensen. Needs life/safet final first.
|
Print Occupancy Form | | | 6/26/2019 | | DONE |
|
|
|
|
Routing - FIRE | 4/2/2019 | 4/2/2019 | 4/5/2019 | | PASS |
Mark Scharfen
|
|
|
IFC Final Report 04.05.2019.pdf uploaded.
|
Plan assigned to (JG) | 2/5/2019 | 2/5/2019 | 4/5/2019 | | PASS |
Javier Guzman
|
|
|
3rd rev, 2/15 L2 Isostore ePlan, pend fire
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/5/2019 | | DONE |
|
|
|
Need
GC Form
|
Telephone call | | | 4/5/2019 | | DONE |
|
|
|
Spoke with Brandon to inform him we need a GC Form filled out. Give the permits@cityofboise.org email.
|
Issue PAID IN FULL permit | | | 4/5/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/5/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/2/2019 | | 4/5/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 3/25/2019 | 3/25/2019 | 3/28/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 2nd review 03.28.2019.pdf uploaded and emailed to applicant.
|
Routing Off Site - STRUCTURAL | 3/25/2019 | | 3/28/2019 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing - PLAN CHECK | 3/25/2019 | | 3/28/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 3/25/2019 | | 3/26/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 2/20/2019 | 2/23/2019 | 2/20/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 2/5/2019 | | 2/20/2019 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Chris Holladay
|
1st review completed | | | 2/20/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 2/5/2019 | 2/5/2019 | 2/15/2019 | | FAIL |
Mark Scharfen
|
|
|
iFC Fire review 02.15.2019.pdf uploaded and emailed to applicant.
|
Routing - PLAN CHECK | 2/5/2019 | | 2/14/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Environmental | 2/5/2019 | | 2/13/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 2/5/2019 | | 2/8/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 2/5/2019 | | 2/5/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/5/2019 | | 2/5/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 2/5/2019 | | 2/5/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Intake Approval | | | 2/4/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/31/2019 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete your prescreen:
I could not locate a newly uploaded cover sheet. Form #304 is not signed by the building owner. Please upload those items.
5. NEW - Provide another drawing sheet with the following items from the checklist: Vicinity Map, Key Plan, Code Analysis, Fire extinguisher locations, exit signage ,etc... This sheet can be stamped by and Idaho licensed engineer or architect.
6. NEW - The new form #304 that was uploaded does not have the building owners signature. Provide owner's signature if switching design professional.
|
Intake Approval | | | 1/8/2019 | | FAIL |
Joe Bruce
|
|
|
5. NEW - Provide another drawing sheet with the following items from the checklist: Vicinity Map, Key Plan, Code Analysis, Fire extinguisher locations, exit signage ,etc... This sheet can be stamped by and Idaho licensed engineer or architect.
|
Intake Approval | | | 1/4/2019 | | FAIL |
Joe Bruce
|
|
|
1. RESOLVED - It appears from the prior permits that a new exterior louver is being installed which would require a zoning certificate. A certificate of zoning compliance is required for any exterior changes to the building. Please contact Katelyn Menuge the Zoning department to verify if this project will require a CZC. Phone: ###-####
2. PROVIDE (still need to structural calculations from the engineer) - No structural engineering stamp was provided on the detail for the MAU and no attachment details or structural calculations were submitted. Provide structural details and calculations for the mechanical unit that is being suspended from the roof structure. These details and calculations must be stamped and signed by and Idaho licensed Structural Engineer.
3. RESOLVED - These could not be located. Provide elevations for the exterior changes being made. The sidewall louver, rooftop equipment, and exhaust flue/vents must be shown.
4. RESOLVED, Larson drawings/titleblock deleted from case. - The architectural drawings appear to be from a prior permit submittal and do not appear to be specifically generated for this permit. Provide written consent from Larson Architects for utilization and modification of their drawings for this project.
5. NEW - Provide another drawing sheet with the following items from the checklist: Vicinity Map, Key Plan, Code Analysis, Fire extinguisher locations, exit signage ,etc... This sheet can be stamped by and Idaho licensed engineer or architect.
|
Intake Approval | | | 1/4/2019 | | FAIL |
Joe Bruce
|
|
|
Spoke with Brandon on the phone about requirements. **JHB** See last intake note.
|
Intake Approval | | | 12/13/2018 | | FAIL |
Joe Bruce
|
|
|
1. RESOLVED - It appears from the prior permits that a new exterior louver is being installed which would require a zoning certificate. A certificate of zoning compliance is required for any exterior changes to the building. Please contact Katelyn Menuge the Zoning department to verify if this project will require a CZC. Phone: ###-####
2. PROVIDE (still need to pass prescreen) - No structural engineering stamp was provided on the detail for the MAU and no attachment details or structural calculations were submitted. Provide structural details and calculations for the mechanical unit that is being suspended from the roof structure. These details and calculations must be stamped and signed by and Idaho licensed Structural Engineer.
3. RESOLVED - These could not be located. Provide elevations for the exterior changes being made. The sidewall louver, rooftop equipment, and exhaust flue/vents must be shown.
4. RESOLVED, Larson drawings/titleblock deleted from case. - The architectural drawings appear to be from a prior permit submittal and do not appear to be specifically generated for this permit. Provide written consent from Larson Architects for utilization and modification of their drawings for this project.
5. NEW - When revised drawings are uploaded they need to have the same file name as the original drawing that were uploaded. The files with REV1 added to them have been deleted from this case. Upload the drawings with identical filenames. Reference the ePlanReview Submittal Standards (page 4) https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
6) NEW - Provide items from the checklist that were provided on Larson's architectural drawings that cannot be used for this submittal. (i.e. Vicinity Map, Key Plan, Code Analysis, etc... - see checklist)
|
Intake Approval | | | 12/10/2018 | | FAIL |
Joe Bruce
|
|
|
1. It appears from the prior permits that a new exterior louver is being installed which would require a zoning certificate. A certificate of zoning compliance is required for any exterior changes to the building. Please contact Katelyn Menuge the Zoning department to verify if this project will require a CZC. Phone: ###-####
2. No structural engineering stamp was provided on the detail for the MAU and no attachment details or structural calculations were submitted. Provide structural details and calculations for the mechanical unit that is being suspended from the roof structure. These details and calculations must be stamped and signed by and Idaho licensed Structural Engineer.
3. These could not be located. Provide elevations for the exterior changes being made. The sidewall louver, rooftop equipment, and exhaust flue/vents must be shown.
4. The architectural drawings appear to be from a prior permit submittal and do not appear to be specifically generated for this permit. Provide written consent from Larson Architects for utilization and modification of their drawings for this project.
|
Intake Approval | | | 11/29/2018 | | FAIL |
Joe Bruce
|
|
|
1. Complete and upload form #304 – Registered Design Professional Form.
2. A certificate of zoning compliance is required for any exterior changes to the building. Please contact Katelyn Menuge the Zoning department to verify if this project will require a CZC. Phone: ###-####
3. Provide structural details and calculations for the mechanical unit that is being suspended from the roof structure. These details and calculations must be stamped and signed by and Idaho licensed Structural Engineer.
4. Provide a roof plan as noted on the checklist. The roof plan could not be located on sheet M-2 as the checklist noted.
5. Provide elevations for the exterior changes being made. The sidewall louver, rooftop equipment, and exhaust flue/vents must be shown.
|
Intake Approval | | | 11/15/2018 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete your prescreen:
1. Complete and upload form #518 – Minor TI Submittal Checklist. Fill out locations of all required information and list the page number for each.
2. Sheets M-1 and M-2 need to be uploaded into the drawings folder. Refer to our ePlan drawings standards located on our website. https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
3. A certificate of zoning compliance is required for any exterior changes to the building. Please contact the Zoning department to verify if this project will require a CZC. Phone: ###-####
4. Provide a vicinity map and key plan.
Since a checklist was not completed with this application a thorough prescreen review could not be completed.
|
Application received | | | 11/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2018 11:41AM
|