BLD-Final | 5/16/2019 | 5/16/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Call ahead // Brad Phone #: ###-####
|
DOC - Permit Finaled | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Other | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Dave Hannah
|
|
|
roof shear // Devan Phone #: ###-#### ok to cover front pouch
|
BLD-Footing | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Tony Young
|
|
|
Brad Phone #: ###-####,, post holes for decks ok
|
PubWorks Subgrade Approval | 1/4/2019 | 1/4/2019 | 1/4/2019 | | DONE |
Melissa Jannusch
|
|
|
FRONT AND BACK PORCH A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | NR |
Tony Young
|
|
|
Devon Phone #: ###-####,, needs soils
|
BLD-Wall cover | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | PASS |
Tony Young
|
|
|
Brad-Ledger for deck Phone #: ###-####,, all taken care of now,, more than plans call for
|
BLD-Footing | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PEND |
Tony Young
|
|
|
lBrad-edger for deck Phone #: ###-####,, not a footing,, deck ledger bolting,, most ok but needs ok or fix from the engineer where the bolts can not go through the lintel on the door header
|
Issue PAID IN FULL permit | | | 12/6/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 11/29/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/13/2018 | 11/13/2018 | 11/29/2018 | | PASS |
Josh Bogle
|
|
|
11/19 porch/deck, ePlan - Hillside/WUI - 1st done
|
Routing - PLAN CHECK | 11/29/2018 | | 11/29/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2018 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 11/29/2018 | | DONE |
|
|
|
MET_Need
RP-Met
|
1st review completed | | | 11/19/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/13/2018 | | 11/19/2018 | | FAIL |
Josh Bogle
|
|
|
plan lacks needed details
|
Routing - PUBLIC WORKS | 11/13/2018 | | 11/14/2018 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Grading-Hillside | 11/14/2018 | | 11/14/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Application received | | | 11/13/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2018 12:30PM
|
Intake Approval | | | 11/13/2018 | | FAIL |
|
|
|
1st prescreen 11-13-18 Please upload plan sheets individually and name accordingly (example: A1.1_site plan)
|
Plans ACCEPTED BY PLAN TECH | | | 11/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/13/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/13/2018 | | DONE |
|
|
|
|
Routing - PLANNING | 11/13/2018 | | 11/13/2018 | | PASS |
Sue Cummings
|
|
|
|