BLD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | DONE |
Tony Young
|
|
|
Call ahead // Matt Phone #: ###-####,, owner okayed to final as is
|
DOC - Permit Finaled | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Tony Young
|
|
|
ok after north steps meet code
|
BLD-Framing/Rough-in | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PASS |
Tony Young
|
|
|
Matt Phone #: ###-####,, frame portion of the deck ok
|
BLD-Footing | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Tony Young
|
|
|
Call ahead to meet // Matt Phone #: ###-####
|
Routing Walk-In (BLD) | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | DONE |
Josh Bogle
|
|
|
|
PubWorks Subgrade Approval | 4/23/2019 | 4/23/2019 | 4/23/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Routing - PLAN CHECK | 4/23/2019 | | 4/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 4/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 4/23/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 4/23/2019 | | DONE |
|
|
|
walk in, no plan mod fee per Josh B
|
BLD-Foundation | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | NR |
Jim Sly
|
|
|
call 10 mins ahead- Matt Phone #: ###-#### Talked to Matt.......Need Public Works approval......1st.
|
Issue PAID IN FULL permit | | | 4/2/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/29/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2019 | | DONE |
|
|
|
left a message for craig informing permit is ready and the fee amount due
|
Plan assigned to (JAB) Josh | 3/11/2019 | 3/11/2019 | 3/28/2019 | | PASS |
Josh Bogle
|
|
|
3/15 deck, paper - 1st done
|
Routing - PLAN CHECK | 3/28/2019 | | 3/28/2019 | | PASS |
Josh Bogle
|
|
|
approved project without stairs
|
Inspection Record Card- Bld | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 3/11/2019 | | 3/13/2019 | | FAIL |
Josh Bogle
|
|
|
stairs not a part of the ATI-ES code compliance report - see paragraph 7.5
|
1st review completed | | | 3/13/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 3/11/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Routing PW Grading-Hillside | 3/11/2019 | | 3/11/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (BLD) | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | FAIL |
Josh Bogle
|
|
|
resubmittal walkin
|
Routing Walk-In (Zoning) | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/13/2018 | | 11/13/2018 | | FAIL |
Josh Bogle
|
|
|
missing some details
|
1st review completed | | | 11/13/2018 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 11/13/2018 | | | |
|
|
|
|