Permit Information
Permit NumberBLD18-04150
StatusIssued
Name SMITH IVAN & STEFANIE FAMILY TRUST
Site Address 1405 N 12TH ST
Project NameSmith basement
Customer Number 
ePlanReviewNo
Description
***03/13/19 PLAN MOD - ADDING INTERIOR FOOTING BETWEEN BDRM #2 AND #3; INSTALLING A 9' BASEMENT WALL INSTEAD OF 8' AS ORIGINALLY SUBMITTED. ENGINEERING HAS BEEN MODIFIED AS WELL. *** BJM *** ***PLAN MOD - NEW STRUCTURAL ENGINEERING SEE PLANS AND CALC'S, NEW FLOOR PLAN NO CHANGES TO EGRESS, ROOF OVERBUILD HIP TO GABLE*** Permit for an addition/remodel that involves: replacing the existing rear enclosed porch with 137sq' of living space, pouring new foundation walls to replace the existing 700sq' of basement living space with 1,102sq' of basement living space, rebuilding the stairs to the basement, and remodeling the kitchen. Final home is 5bd/3bth. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/27/201911/27/201912/2/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/26/201911/26/201912/2/2019 PEND
DetailsTony Young
BLD-Wall cover7/15/20197/15/20197/15/2019PPASS
DetailsDave Hannah
Ivan- Phone #: ###-####
BLD-Energy code compliance7/5/20197/5/20197/5/2019PPART
DetailsJim Storey
Ivan Phone #: ###-#### air seal ok
BLD-Framing/Rough-in7/1/20197/1/20197/1/2019PPASS
DetailsBrandon Shaw
Ivan Phone #: ###-####
BLD-Conference6/13/20196/13/20196/13/2019PPART
DetailsTony Young
Ivan Phone #: ###-####,, roof ?s
BLD-Foundation6/5/20196/6/20196/6/2019PPART
DetailsTony Young
Jeff-WALL Phone #: ###-####,, work in progress on rear basement wall
BLD-Conference6/5/20196/5/20196/5/2019PPART
DetailsTony Young
Ivan Phone #: ###-####,, roof ?s
BLD-Footing5/15/20195/15/20195/15/2019PPASS
DetailsTony Young
Jeff Phone #: ###-####
BLD-Concrete3/25/20193/26/20193/26/2019APART
DetailsTony Young
Jeff- foundation wall Phone #: ###-####,, basement walls ok now,, work in progress
BLD-Wall Bracing3/21/20193/22/20193/22/2019ANR
DetailsTony Young
Jeff Phone #: ###-####,, ICF basement walls,, can not really see the rebar,, not square or plumb
OVERRIDE  3/13/2019  
(F) Reprint permit  3/13/2019 DONE
CHANGE STATUS TO (ISS)  3/13/2019 DONE
Routing - PLAN CHECK3/13/2019 3/13/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  3/13/2019 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  3/13/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/13/2019 DONE
DetailsBrian McGowan
1/2 hour of plan review.
Plan Modification Accepted  3/13/2019 DONE
per Brian
Permit Ready to Issue  3/13/2019 DONE
BLD-Footing2/26/20192/26/20192/26/2019PPART
DetailsTony Young
Jeff Phone #: ###-####,, exterior basement footings,, work in progress
BLD-Footing2/4/20192/4/20192/4/2019PPART
DetailsTony Young
Jeff Phone #: ###-####,, pier footings in center of basement ok
OVERRIDE  1/30/2019  
Routing Walk-In (BLD)1/30/20191/30/20191/30/2019APASS
DetailsMichael Hanson
Routing - PLAN CHECK1/30/2019 1/30/2019 PASS
DetailsMichael Hanson
Case Summary (BLD)  1/30/2019 DONE
DetailsMichael Hanson
Inspection Record Card- Bld  1/30/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/30/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/30/2019 DONE
Plan mod
CHANGE STATUS TO (ISS)  1/30/2019 DONE
plan mod
Routing Walk-In (BLD)1/11/20191/11/20191/11/2019APASS
DetailsJosh Bogle
Questions for requirements on potential changes to issued dwgs.
BLD-Conference12/12/201812/12/201812/12/2018PPART
DetailsTony Young
Ivan Phone #: ###-####,, ?s on permit and inspection procedure,, ok,, ok to start demo work
Issue PAID IN FULL permit  11/23/2018 DONE
OVERRIDE  11/19/2018  
Plan assigned to (JAB) Josh11/14/201811/14/201811/19/2018 PASS
DetailsJosh Bogle
11/20 basement addition, paper
Routing - PLAN CHECK11/15/2018 11/19/2018 PASS
DetailsJosh Bogle
1st review completed  11/19/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  11/19/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  11/19/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/19/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  11/19/2018 DONE
Telephone call  11/19/2018 DONE
Spoke with Ivan to inform him the permit is ready and what fees are due.
Routing - MECHANICAL11/14/2018 11/15/2018 PASS
DetailsTroy James
Routing Walk-In (Zoning)11/14/201811/14/201811/14/2018ADONE
DetailsLeon Letson
Intake Approval  11/14/2018 PASS
DetailsMichael Hanson
I have asked applicant to provide updated wall bracing calculations. MDH
Application received 11/14/2018