Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD18-04159
StatusFinaled
Name FALASH & COMPANY INC
Site Address 1702 W FAIRVIEW AVE
Project NameGustavel Orthopedics
Customer NumberBLD18-03967 DEMO
ePlanReviewYes
Description
(GUSTAVEL ORTHOPEDICS – KING BUILDING) //Plan modifications to stair structural framing, door relocation, door swing, interior wall layout shift and revise type/size of select exterior windows. 1-07-2019 JG// Permit is to remodel an existing 4,323 sq. ft. building (2,203 sq. ft. 1st story + 1,551 sq. ft. 2nd story and about 600sq. ft. exterior patio). Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of exterior and select interior windows, removal of interior nonbearing walls, removal of select interior bearing wall, removal of select door/door frames and relocate, removal of interior stairs and guards, removal of select millwork, construction of interior non-bearing walls to create (3) exam rooms, a reception/lobby area, an X-Ray room, a casting room, a nurse’s area, an accessible restroom, (3) offices, a break room, a storage room, a lounge area and an open office area, new interior stairs, new raised floor landing, new exterior metal canopy, new exterior store front and interior windows, select new door/door frames, select new exterior wall infill, new Hi/Lo drinking fountain, select ne gypsum ceiling, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: special inspection required, see attached form 310. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  4/22/2019 DONE
First Notice 3/21/20194/8/2019 DONE
mailed 4-11-19
BLD-Final3/7/20193/8/20193/11/2019APASS
DetailsDave Hannah
Greg Phone #: ###-####
Permanent Occupancy  3/11/2019 DONE
BLD-Final3/5/20193/5/20193/5/2019PPART
DetailsDave Hannah
Greg Phone #: ###-#### ok for tco needs to fix ada counter top break rm need engineering on cable gaurd rail wiondow stops ada signage handrails
FIRE-Final Inspection3/5/20193/5/20193/5/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final life fire safety inspection for area of work complete.

Greg Phone #: ###-####
FIRE-Final Inspection3/4/20193/4/20193/4/2019PFAIL
DetailsJim Page
Emergency lighting does not match the city approved draiwngs. Provide emergency lighitng for exterior discharge per 2015 IFC section 1008. Provide fire extinguisher on level 2 as discussed.

gREG Phone #: ###-####
BLD-Ceiling Grid Inspection2/12/20192/13/20192/13/2019APASS
DetailsDave Hannah
Greg Phone #: ###-####
CHANGE STATUS TO (ISS)  1/30/2019 DONE
Print Occupancy Form  1/30/2019 DONE
Plan assigned to (JG)1/2/20191/2/20191/29/2019 PASS
DetailsJavier Guzman
1st rev comp, Plan Mod Gustavel OrthopedicsTI ePlan pend eng
Routing Off Site - STRUCTURAL1/22/2019 1/29/2019 PASS
DetailsJavier Guzman
signed off in ePlan by KPFF Cory Harelson
Permit Ready to Issue  1/29/2019 DONE
PLAN MOD
Routing - PLAN CHECK1/22/2019 1/28/2019 PASS
DetailsJavier Guzman
Routing - PLAN CHECK1/9/2019 1/15/2019 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL1/9/2019 1/15/2019 FAIL
DetailsJavier Guzman
failed in ePlan by KPFF Cory Harelson

Routing - Design Review1/9/2019 1/9/2019 PASS
DetailsKayCee Babb
per CZC18-00242
BLD-Framing/Rough-in1/3/20191/4/20191/4/2019PPASS
DetailsDave Hannah
DOES NOT HAVE TO DO WITH STAIRS OR SECOND FL FRAMING // Call 20 mins before to meet Greg Phone #: ###-####
Plan Reviewer's activity  1/3/2019 DONE
DetailsJavier Guzman
**Plan Mod prescreen**
Provide and upload the following:
• Plan sheet S2.01 and S2.02 with a valid Idaho licensed engineers stamp
• Revised framing does not match uploaded engineering, provide revised engineering stamped by an Idaho licensed engineer
Plan Modification Accepted  1/2/2019 DONE
A2.01 FLOOR PLANS & A3.01/A3.02 EXTERIOR ELEVATIONS / 46.01 SCHEDUELDS & DETAILS. A5.01 VERTICAL CIRCULATION & A5.02 VERTICAL CIRCULATION DETAILS. S2.01 LOWER STAIR FRAMING PLAN & 2.02 SECOND FLOOR FRAMING PLAN
Issue PAID IN FULL permit  12/28/2018 DONE
Print Occupancy Form  12/28/2018 DONE
Plan assigned to (JG)11/28/201811/28/201812/27/2018 PASS
DetailsJavier Guzman
1st rev comp, 12/10 L2 Gustavel OrthopedicsTI ePlan 12/18
Routing - PLAN CHECK12/18/2018 12/27/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/18/2018 12/27/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by KPFF Cory Harelson
Routing - PLAN CHECK12/27/2018 12/27/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/27/2018 12/27/2018 PASS
DetailsJavier Guzman
signed off in ePlan by KPFF Cory Harelson
PLANS/APPL TAKEN TO FRONT DESK  12/27/2018 DONE
Permit Ready to Issue  12/27/2018 DONE
MET
NEED
GC FORM
REVISED VALUE
Routing - PLUMBING12/18/2018 12/18/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Route to Impact Fee Review12/11/201812/14/201812/12/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL11/28/2018 12/11/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by KPFF Cory Harelson

1st review completed  12/11/2018 FAIL
DetailsJavier Guzman
Routing - FIRE11/28/201811/28/201812/10/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLAN CHECK11/28/2018 12/10/2018 FAIL
DetailsJavier Guzman
Routing - MECHANICAL11/28/2018 11/29/2018 PASS
DetailsTroy James
No mechanical work shown. Additional mechanical ventilation not required.
Routing - PLUMBING11/28/2018 11/29/2018 FAIL
DetailsDaryl Spivey
1. Waste and water calculation tables don't reflect what is shown on plan.
2. Water service backflow protection required.
Routing - Addressing11/28/2018 11/28/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/28/2018 11/28/2018 PASS
DetailsMorgan Webb
Routing - Design Review11/28/2018 11/28/2018 PASS
DetailsKayCee Babb
per CZC18-00242
Routing PW Environmental11/28/2018 11/28/2018 PASS
DetailsTerry Alber
If any x-ray equipment involves traditional processing, silver-bearing wastewater must be pretreated prior to discharge to the sanitary sewer system.
Intake Approval  11/27/2018 FAIL
DetailsJoe Bruce
2. Form #310 is missing the Special Inspection Firm information. Select a special inspections firm. There is a list of approved special inspection firms on the City of Boise's website. https://pds.cityofboise.org/media/173900/approved-special-inspection-firms-list-6-14-16.pdf
Intake Approval  11/27/2018 PASS
DetailsJavier Guzman
Intake Approval  11/16/2018 FAIL
DetailsJoe Bruce
1. Form #304 is missing the date next to the owner's (Mr. Gustavel's) signature. Please have the owner write in the date when this form was signed.
2. Form #310 is missing the Special Inspection Firm information along with the owner's signature. The owner's signature is required on this form. Select a special inspections firm. There is a list of approved special inspection firms on the City of Boise's website.
3. Per the City of Boise's Cable Guard Policy: Provide all the required design criteria and documentation for the stainless steel cable railing system specified on sheet A5.02. A link to our policy can be found here:
http://pds.boise.local/media/146485/cable_guard_policy2012_ibc_irc_signed_3_16_18.pdf
4. Per the condition #4 of the Certificate of Zoning Compliance: Provide a license agreement with ACHD for any encroachment of awnings into the Public right-of-way prior to submitting for Building permits.
Intake Approval  11/15/2018 FAIL
DetailsJoe Bruce
Provide the following items to complete your prescreen:
1. Complete and upload form #518 – Minor TI Submittal Checklist. Fill out locations of all required information and list the page number for each. You will need to provide all items noted in the checklist with a correct page reference.
2. Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.

Since a checklist was not completed with this application a thorough prescreen review could not be completed.
Application received  11/14/2018 DONE
Application submitted via PDS Online on Nov 14 2018 3:37PM