Print Statement | | | 4/22/2019 | | DONE |
|
|
|
|
First Notice | | 3/21/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
BLD-Final | 3/7/2019 | 3/8/2019 | 3/11/2019 | A | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
Permanent Occupancy | | | 3/11/2019 | | DONE |
|
|
|
|
BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PART |
Dave Hannah
|
|
|
Greg Phone #: ###-#### ok for tco needs to fix ada counter top break rm need engineering on cable gaurd rail wiondow stops ada signage handrails
|
FIRE-Final Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
Greg Phone #: ###-####
|
FIRE-Final Inspection | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | FAIL |
Jim Page
|
|
|
Emergency lighting does not match the city approved draiwngs. Provide emergency lighitng for exterior discharge per 2015 IFC section 1008. Provide fire extinguisher on level 2 as discussed.
gREG Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/30/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/30/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 1/2/2019 | 1/2/2019 | 1/29/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Gustavel OrthopedicsTI ePlan pend eng
|
Routing Off Site - STRUCTURAL | 1/22/2019 | | 1/29/2019 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF Cory Harelson
|
Permit Ready to Issue | | | 1/29/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLAN CHECK | 1/22/2019 | | 1/28/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/9/2019 | | 1/15/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/2019 | | 1/15/2019 | | FAIL |
Javier Guzman
|
|
|
failed in ePlan by KPFF Cory Harelson
|
Routing - Design Review | 1/9/2019 | | 1/9/2019 | | PASS |
KayCee Babb
|
|
|
per CZC18-00242
|
BLD-Framing/Rough-in | 1/3/2019 | 1/4/2019 | 1/4/2019 | P | PASS |
Dave Hannah
|
|
|
DOES NOT HAVE TO DO WITH STAIRS OR SECOND FL FRAMING // Call 20 mins before to meet Greg Phone #: ###-####
|
Plan Reviewer's activity | | | 1/3/2019 | | DONE |
Javier Guzman
|
|
|
**Plan Mod prescreen**
Provide and upload the following:
• Plan sheet S2.01 and S2.02 with a valid Idaho licensed engineers stamp
• Revised framing does not match uploaded engineering, provide revised engineering stamped by an Idaho licensed engineer
|
Plan Modification Accepted | | | 1/2/2019 | | DONE |
|
|
|
A2.01 FLOOR PLANS & A3.01/A3.02 EXTERIOR ELEVATIONS / 46.01 SCHEDUELDS & DETAILS. A5.01 VERTICAL CIRCULATION & A5.02 VERTICAL CIRCULATION DETAILS. S2.01 LOWER STAIR FRAMING PLAN & 2.02 SECOND FLOOR FRAMING PLAN
|
Issue PAID IN FULL permit | | | 12/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 11/28/2018 | 11/28/2018 | 12/27/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 12/10 L2 Gustavel OrthopedicsTI ePlan 12/18
|
Routing - PLAN CHECK | 12/18/2018 | | 12/27/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 12/18/2018 | | 12/27/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF Cory Harelson
|
Routing - PLAN CHECK | 12/27/2018 | | 12/27/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 12/27/2018 | | 12/27/2018 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF Cory Harelson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/27/2018 | | DONE |
|
|
|
MET
NEED
GC FORM
REVISED VALUE
|
Routing - PLUMBING | 12/18/2018 | | 12/18/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Route to Impact Fee Review | 12/11/2018 | 12/14/2018 | 12/12/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 11/28/2018 | | 12/11/2018 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF Cory Harelson
|
1st review completed | | | 12/11/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 11/28/2018 | 11/28/2018 | 12/10/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLAN CHECK | 11/28/2018 | | 12/10/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 11/28/2018 | | 11/29/2018 | | PASS |
Troy James
|
|
|
No mechanical work shown. Additional mechanical ventilation not required.
|
Routing - PLUMBING | 11/28/2018 | | 11/29/2018 | | FAIL |
Daryl Spivey
|
|
|
1. Waste and water calculation tables don't reflect what is shown on plan.
2. Water service backflow protection required.
|
Routing - Addressing | 11/28/2018 | | 11/28/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/28/2018 | | 11/28/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 11/28/2018 | | 11/28/2018 | | PASS |
KayCee Babb
|
|
|
per CZC18-00242
|
Routing PW Environmental | 11/28/2018 | | 11/28/2018 | | PASS |
Terry Alber
|
|
|
If any x-ray equipment involves traditional processing, silver-bearing wastewater must be pretreated prior to discharge to the sanitary sewer system.
|
Intake Approval | | | 11/27/2018 | | FAIL |
Joe Bruce
|
|
|
2. Form #310 is missing the Special Inspection Firm information. Select a special inspections firm. There is a list of approved special inspection firms on the City of Boise's website. https://pds.cityofboise.org/media/173900/approved-special-inspection-firms-list-6-14-16.pdf
|
Intake Approval | | | 11/27/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 11/16/2018 | | FAIL |
Joe Bruce
|
|
|
1. Form #304 is missing the date next to the owner's (Mr. Gustavel's) signature. Please have the owner write in the date when this form was signed.
2. Form #310 is missing the Special Inspection Firm information along with the owner's signature. The owner's signature is required on this form. Select a special inspections firm. There is a list of approved special inspection firms on the City of Boise's website.
3. Per the City of Boise's Cable Guard Policy: Provide all the required design criteria and documentation for the stainless steel cable railing system specified on sheet A5.02. A link to our policy can be found here:
http://pds.boise.local/media/146485/cable_guard_policy2012_ibc_irc_signed_3_16_18.pdf
4. Per the condition #4 of the Certificate of Zoning Compliance: Provide a license agreement with ACHD for any encroachment of awnings into the Public right-of-way prior to submitting for Building permits.
|
Intake Approval | | | 11/15/2018 | | FAIL |
Joe Bruce
|
|
|
Provide the following items to complete your prescreen:
1. Complete and upload form #518 – Minor TI Submittal Checklist. Fill out locations of all required information and list the page number for each. You will need to provide all items noted in the checklist with a correct page reference.
2. Plan sheets do not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp.
Since a checklist was not completed with this application a thorough prescreen review could not be completed.
|
Application received | | | 11/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 14 2018 3:37PM
|